多投资主体建设项目经济评价中的风险NPV法 被引量:3

Risk NPV Method used in Economic Evaluation of Construction Project Invested by Multi-investment Subject
下载PDF
导出
摘要 建设项目往往投资大 ,回收期长 ,具有极大的财务和市场风险。随着建设项目投资主体多元化和融资渠道多样化的越来越多出现 ,传统的建设项目经济评价方法已不能满足实际的需要 ,对这些项目的经济评价需要一种综合风险因素的更有效方法。NPV法作为一种动态评价方法 ,长期以来广泛应用于建设项目的经济评价。基于这种方法 ,并结合加权平均资本成本法和蒙特卡罗模拟 ,提出了一种风险NPV法。 Construction project is featured by great investment and long payback period. It has enormous financial and market risk. Furthermore, companied by the phenomenon of multi-investment parties and various financing channels for large construction project, traditional construction project economic evaluation methods can't be satisfied in practice. Economic evaluation on these projects needs a more effective method that takes risk into account. As a dynamic method, net value method has been applied extensively in construction project economic evaluation. Based on it, and combined the weighted average cost of capital method and monte carlo simulation, this paper presents a risk NPV method.
作者 张武 宇德明
出处 《基建优化》 2002年第6期30-31,34,共3页 Optimization of Capital Construction
关键词 建设项目 折现率 风险NPV法 蒙特卡罗模拟 加权平均资本成本法 construction project discount rate risk NPV method monte carlo simulation WACC
  • 相关文献

参考文献3

  • 1李世蓉.工程建设风险管理[M].北京:中国建筑工业出版社,2000..
  • 2国家计委,建设部.建设项目经济评价方法与参数(第二版)[M].北京:中国计划出版社,1998.
  • 3Sudong Ye, Robert L. k. Tiong. NPV-at-risk in Infrastructure Project Investment Evaluation [J]. Journal of Construction Engineering and Management, ASCE, 2000,126(3).

共引文献5

同被引文献8

引证文献3

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部