摘要
介绍了妈湾电厂 4× 3 0 0 MW机组汽轮机高中压缸疏水的优化方案 ,该优化方案的实施 ,不仅简化了系统 ,而且提高了机组的经济性和安全可靠性 ,对同类机组的制造、设计及优化提供了参考。
The optimal scheme of the high & intermediate pressure cylinder drainage system of the 4×300MW steam turbine units at Mawan Thermal Power Plant was introduced.The implementation of the optimal scheme had not only simplified the system but also improved economy,safety and reliability of the units.So it can give a reference to manufacture,design and optimization of similar type units.
出处
《湖北电力》
2002年第5期26-27,33,共3页
Hubei Electric Power