摘要
上海世茂深坑酒店主体立面呈曲线形状,南侧结构单向侧倾,北侧结构双向侧倾,主体钢结构的安装测量定位难度较高,采用三维空间定位测量及变形监测方法对安装全过程进行控制,通过精确的测量控制,将坑内主体结构与坑外裙楼完美合拢。
Shanghai Shimao Pit Hotel is the main pit elevation curve shape.The south side structure is tiltedin in one direction and the north side structure is tilted in both directions.The installation measurement and positioning of the main steel structure are more difficult.The three-dimensional position measurement and deformation monitoring methods were adopted to control the whole process of installation,through measuring precise control,will be the main structure and the podium outside the pit are closured perfectly.
出处
《建筑结构》
CSCD
北大核心
2017年第S1期1170-1175,共6页
Building Structure
关键词
钢结构
安装测量
变形监测
steel structure
installation measurement
deformation monitoring