大跨度混凝土斜拉桥主梁应力监测中徐变应变的分离 被引量:27

Separation of Creep Strain in Stress Monitoring for Main Girder of Long-Span Concrete Cable-Stayed Bridge
下载PDF
导出
摘要 针对目前混凝土斜拉桥在施工控制中应力监测作为存在的难题,提出了一种适用于大跨度混凝土斜拉桥主梁应力监测新方法。该方法利用主梁中性轴应力只与斜拉索水平分力有关这一特点,根据实测索力求出中性轴应力,据此校准中性轴的实测应力并识别徐变系数,继而求出其余应力。 In consideration that the stress monitoring is a difficult point in the present construction control of concrete cablestayed bridge, a kind of new method applicable to the stress monitoring for the main girder of longspan concrete cablestayed bridge is proposed. Taking advantage that the neutral axial stress of the main girder is only related to the horizontal component of the stay cables, the method provides solution of the neutral axial stress according to the actual measurement of cable force with which the actuallymeasured stress of the neutral axis can be calibrated and the creep coefficients can be identified, and further, the solution of the remaining stress will be derived.
出处 《桥梁建设》 EI CSCD 北大核心 2003年第1期55-58,共4页 Bridge Construction
基金 广东省自然科学基金资助项目(000387)
关键词 大跨度混凝土斜拉桥 主梁 应变 分离 应力监测 施工控制 徐变 cable-stayed bridge stress monitoring construction control creep
  • 相关文献

参考文献3

  • 1郭良友,林一宁,李文波,刘虹.武汉长江二桥的索力、温度和应力测量[J].桥梁建设,1995,25(3):44-53. 被引量:34
  • 2陈太聪 苏成 邓江 等.考虑节段施工的结构收缩徐变效应分析[A].韩大建魏德敏主编.计算机在土木工程中的应用[C].广州:华南理工大学出版社,2000..
  • 3周履 陈永春.收缩徐变[M].北京:中国铁道出版社,1988..