某金属矿井下-280m排水系统方案研究

Scheme of -280m Drainage System in a Metal Mine
下载PDF
导出
摘要 简要介绍了某矿开拓现状和排水系统现状,为制定出该矿-20m排水系统的最优方案,根据矿山井下涌水量情况和矿山现状,对井下-20m排水系统提出了三种方案,并进行了详细叙述。经过技术经济比较、优缺点比较论证后,并结合矿山现状,最终选择出直排加转排的最优排水系统方案。该方案能解决各种限制条件和充分利用有利现状。 The development situation and the present state of drainage system in a mine were briefly introduced, in order to formulate optimal scheme of the mine -280m drainage system, according to the mine inflow of water conditions and the current situation of the mine, three schemes of -280m drainage system were described in detail. After technical economic comparison, advantages and disadvantages of comparison and demonstration, and combined with the current situation of mine, finally chosen the optimal scheme of direct drainage and relay drainage.The scheme can solve all kinds of restrictions and make full use of the favorable situation.
作者 李含明
出处 《中国金属通报》 2015年第S1期176-180,共5页 China Metal Bulletin
关键词 采矿工程 排水 水泵 方案 mine engineering drainage pump scheme
  • 相关文献

参考文献1

  • 1GB 16423-2006.金属非金属矿山安全规程[S]. 2006

共引文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部