摘要
结合北京望京SOHO T3塔楼钢结构工程施工过程,介绍复杂超高层钢结构施工测量技术的应用情况。包括地下、地上结构测量控制轴网、相对坐标系与大地坐标系之间的转换、轴线控制点的竖向传递、大型相贯节点圆管柱的测量控制、外围曲线楼板边线的测量控制等。
With the construction process of Wangjing SOHO T3 Tower, the application of the measure technology of the complex buildings is recited, including the control axis of the top and undergrad, the change between the Relative coordinate system and Geodetic coordinate system, vertical transfer of the control points,control measure of the big node and the periphery line of the plane.
出处
《建筑技术》
2014年第7期661-663,共3页
Architecture Technology
关键词
超高层钢结构
施工测量
坐标系转换
super high-rise steel building
construction management
change between deferent coordinate systems