江垭大坝及近坝山体抬升变形研究 被引量:6

Study on the uplift deformation of Jiangya Dam and its near-by mountainous body
下载PDF
导出
摘要 江垭水库蓄水后,大坝及近坝山体产生抬升。所测山体最大抬升21 8mm,120m高程廊道最大抬升34 5mm,为国内外所罕见。为研究抬升的原因及对工程安全的影响,在坝区、坝顶及120m高程廊道内建立了监测系统,进行了较长期的观测,并做了数值模拟计算和室内岩石力学试验,确认大坝可以正常运行。 After the impoundment of Jiangya Reservoir, the dam and its nearby mountainous body appear uplift. The maximum measured uplift of the mountainous body is 21.8 mm and that of the gallery at the elevation of 120 m is 34.5 mm, rare in the world. In order to study the effect of such uplift on the safety of project, the monitoring system has been set up for a long-term observation in the dam area, dam crest and the gallery at the elevation of 120 m. And the numerical simulation calculation and indoor rock mechanics test have been made. It is concluded that the dam can be operated normally. 
出处 《水力发电》 北大核心 2003年第3期9-12,共4页 Water Power
关键词 坝工 岩体抬升 工程安全 江垭水库 dam area, uplift of rock body, the safety of project, Jiangya Reservoir
  • 相关文献

同被引文献33

引证文献6

二级引证文献28

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部