期刊文献+

大红山铁矿地表塌陷区综合治理方案研究 被引量:5

Research on the Comprehensive Treatment Scheme of Surface Subsidence in Dahongshan Iron Mine
下载PDF
导出
摘要 随着大红山铁矿开采深度的不断下降,无底柱分段崩落法开采后形成的地表塌陷区范围逐步扩大。为解决塌陷区带来的一系列不良影响和问题,在前期充分研究掌握矿山塌陷坑及岩移发展规律的基础上,通过系统研究,最终采用废石回填方式治理塌陷区,提出了单台阶堆排废石回填技术方案,并进行地表生态恢复,方案科学合理、可操作性强,为其他矿山塌陷区治理工程提供了借鉴。 With the falling of the mining depth of Dahongshan iron mine,the surface subsidence scope formed by non-pillar sublevel caving mining method is expanded gradually.In order to solve the adverse effects and problems caused by subsidence areas,based on researching the development regulari-ties of the mine subsidence areas and rock movement,the waste rocks backfilling method is adopted to deal with the subsidence areas by systematically analysis,the waste rocks backfilling technical scheme by single step stacked is proposed,and the surface ecological environment is restored.On the whole,the scheme proposed in this paper has the characteristics of scientific,reasonable and operability.Besides that,it also has reference for the other mine subsidence areas treatment engineering.
出处 《现代矿业》 CAS 2016年第2期135-137,146,共4页 Modern Mining
关键词 崩落法 地表塌陷区 废石回填 综合治理 Caving method Surface subsidence area Waste rocks backfilling Comprehensive treatment
  • 相关文献

参考文献2

二级参考文献9

共引文献14

同被引文献72

引证文献5

二级引证文献22

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部