摘要
新疆下坂地水利枢纽工程与巴基斯坦塔贝拉坝工程都存在深覆盖层问题。通过对塔贝拉坝工程的实地考察 ,本文在综合对比和分析研究的基础上 。
Xiabandi hydro-junction and the Pakistan Tamla dam both exist the same problem: deep overburden layer. Through site investigation to the Tamla dam, on the basis of comprehensive comparison and analysis, the author presents the feasibility of the seepage prevention of deep overburden layer to the water control project by using a horizontal impervious blanket and the technical measures.
出处
《西北水资源与水工程》
2003年第1期62-64,共3页
Northwest Water Resources & Water Engineering