摘要
对桂林虹源发电有限公司 135MW机组汽轮机的单阀、顺序阀切换过程进行了介绍 ,并对控制过程进行了分析。结合现场数据 。
The changeover process from single value to sequence valve operation mode for steam turbine of a 135 MW unit in Hongyuan Power Generation Company of Guilin City has been presented, and the control process being analysed. Combined with data obtained in the field, the concrete operating steps in realizing the above-mentioned changeover have been put forward.
出处
《热力发电》
CAS
北大核心
2003年第4期34-35,38,共3页
Thermal Power Generation