摘要
根据祁临高速公路十四合同段的黄土冲沟高填方路基施工情况,简要介绍了施工的针对性措施和计量方法。
Combined with the construction of loess gully high fill subgrade,the paper discussed the measures and measurement methods.
出处
《山西交通科技》
2002年第A02期66-67,共2页
Shanxi Science & Technology of Transportation