摘要 针对国投哈密一矿原井田开拓方案存在的不足,结合影响井田开拓方案选择的各种因素,对原井田开拓方案进行了优化,根据煤矿建设项目的特点和生产实际,采用整体比选法中的费用现值法作为具体比选方法,通过对两个开拓方案从建设期、生产期及全寿命周期三个方面进行技术和经济分析比较,结果表明了优化后的开拓方案更为合理。整体比选法的应用,为合理确定井田开拓方案提供了有效的解决途径。 In light of the deficiencies of the original minefield development scheme for the SDIC Hami No. 1 Mine,combined with various factors affecting the selection of minefield development schemes,the original minefield development scheme was optimized. According to the characteristics of the coal mine construction project and the actual production,the present value method of the overall comparison method was adopted. Through the technical and economic analysis and comparison of the two development schemes from the three aspects of construction period, production period and life cycle, it shows that the optimized development plan is more reasonable. The overall comparison and selection method is an effective solution to reasonably determine the field development plan.
作者 刘亮 LIU Liang(China National Investment Consulting Co.,Ltd.Beijing 100034,China)
出处 《煤炭工程》 北大核心 2019年第3期5-8,共4页 Coal Engineering
关键词 整体比选法 开拓方案 斜井 全生命周期 overall comparison and selection development scheme inclined shaft full life circle
  • 相关文献

参考文献3

二级参考文献20

  • 1Hart J W,Kamber M.数据挖掘一概念与技术[M].范明,孟小峰,译.北京:机械工业出版社,2001.
  • 2GB 50215-2005,煤炭工业矿井设计规范[S].
  • 3中国煤炭建设协会,住房和城乡建设部标准定额研究所.煤炭建设项目经济评价方法与参数[M].北京:中国计划出版社,2009.
  • 4煤炭安全规程[M].北京:煤炭工业出版社,2011.
  • 5GB 50215-2005,煤炭工业矿井设计规范[S].
  • 6张荣立,何国纬,李铎.采矿设计手册[M].北京:煤炭工业出版社,2003.
  • 7GB 50511-2010,煤矿井巷工程施工规范[S].
  • 8国家能源局煤炭司中国煤炭发展研究中心.煤炭工业发展"十二五"规划辅助读本[M].北京:煤炭工业出版社,2012.
  • 9中国煤炭建设协会.煤炭建设工程费用定额及煤炭建设其他费用规定(修订)[M].北京:煤炭工业出版社,2011.
  • 10李斌宇.李家楼在建煤矿井型开拓及采煤方法优化设计[J].煤炭工程,2009,41(10):5-8. 被引量:12