摘要
介绍了影响转炉冶炼周期的因素,和根据柳钢现有条件提出的攻关措施以及攻关以后取得的效果。
The factors of influencing the combustion cycle of converter furnace,the countermeasures referenced with the current situation of Liu Gang and the obtained effect after carrying out these measures are introduced.