摘要
介绍了高炉冷却壁的传统安装方法 ,并对安装高炉冷却壁的改进方法进行了详细说明 ,通过与传统方法的对比 。
The traditional installation method of blast furnace cooling stave and its improved method preassembly method are introduced. Through comparative analysis with traditional method the rationality and high performance of the preassembly construction are verified.
出处
《山西建筑》
2003年第6期68-69,共2页
Shanxi Architecture