在设定一些污水处理工程的建设条件与要求后,提出了某一地区10年内建设5个规模相同的污水处理厂的两种建设方案;在对两种方案进行投资效益比较的基础上,分析了实施先进建设方案的可行性及目前存在的问题。
After setting some conditions and requirements for constructing the sewage treatment engineering, this paper puts forward two construction projects of building five same sewage treatment plants in a decade. Based on the comparison of investment benefit of the two projects, this paper analyses the feasibility of practicing advanced construction plan and existing problems.