期刊文献+

支持团队工作的工作流技术研究 被引量:5

Technology of Teamwork-Supported Workflow
下载PDF
导出
摘要 针对工作流系统对动态团队和不确定性任务支持的要求,首先利用面向对象技术建模团队的组织结构,并采用对象约束语言规范化描述团队内部结构约束和"团队-任务"约束,然后提出了任务版本的概念,用来解决团队对应的工作流任务不确定问题,并讨论了集成实现中的若干关键问题。通过定义工作表单来描述任务数据,利用一定的规则实现多任务版本的配置,最后给出了具体的实现步骤。 The request of workflow system to support the dynamic team and indeterminate task, is firstly analyzed. According to it, the organization structure is modeling based on object-oriented technology, and the constraints within the team structure and team-to-task are formally expressed by object constraint language (OCL). Secondly, the concept of task revision is proposed, which can solve the problem that the team task may be uncertain. Some key issues on integrated implementation are discussed, such as describing the task data through workflow form and configuring task revision by some rules. Finally,all implementing steps are given.
出处 《计算机集成制造系统-CIMS》 EI CSCD 北大核心 2003年第8期635-640,共6页
基金 国家自然科学基金资助项目(50275056)。~~
关键词 工作流 组织模型 面向对象技术 对象约束语言 表单 任务配置 workflow organization model object-oriented technology object constraint language form task configuration
  • 相关文献

参考文献5

  • 1CHENG E C. An object-oriented organization model to support dynamic role--based access control in electronic commerce[J]. Decision Support Systems,2000,29(4):357-369.
  • 2AALST W M P, KUMAR A. A reference model for teamenabled workflow management systems[J]. Data & Knowledge Engineering ,2001,38(3) :335-363.
  • 3LIU Dongsheng,WANG Jiangmin,CHAN S C F, et al. Modeling workflow processes with colored Petri nets[J]. Computers in Industry,2002,49(8):267-281.
  • 4Rational Software. Object Constraint Language Specification(Version 1.1), 1997[S].
  • 5AALST W. M. P. The application of petri nets to workflow management[J]. The Journal of Circuits,Systems and Computers,1998, 8(1): 21-66.

同被引文献23

  • 1周晓晔,王成恩,罗焕佐.基于UML的企业组织建模方法[J].中国机械工程,2004,15(12):1091-1094. 被引量:9
  • 2郭雪松,孙林岩,徐晟.工作流协同系统性能评价研究[J].管理科学,2005,18(6):2-5. 被引量:2
  • 3朱海平,肖诗旺,车争.支持业务流程分析的工作流仿真研究[J].小型微型计算机系统,2006,27(8):1531-1535. 被引量:5
  • 4肖志娇,常会友,衣杨.工作流时间性能分析方法[J].计算机集成制造系统,2006,12(8):1284-1287. 被引量:10
  • 5范玉顺.工作流管理技术基础[M].清华大学出版社,2001..
  • 6Eder J,Panagos E,Rabinovich M.Time constraints in workflow systems[C].In:Proceedings of the 11th Conference on Advanced Information Systems Engineering (CaiSE ' 99).Heidelberg,1999:1~14.
  • 7Kees van Hee,Hajo Reijers,Eric Verbeek.On the Optimal Allocation of Resources in Stochastic Workflow Nets[C].Proceedings of the Seventeenth UK Performance Engineering Workshop.Print Services University of Leeds,Leeds,2001:23-34.
  • 8W.M.P.van der Aalst.The application of Petri nets to workflow management[J].The Journal of Circuits Systems and Computers,1998,8(1):21~66.
  • 9MIERS D, HURT R. Process product watch - work management technologies report -evaluation framework process support system [M]. England: England Enix Limited, 1995.
  • 10CARLSEN S. Action port model:a mixed paradigm conceptual workflow modeling language [DB/OL]. http://csdl. comput -er. org/comp/proceedings/coopis/1998/8380/00/83800300abs.htm,1998.

引证文献5

二级引证文献24

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部