摘要
以大型商业办公建筑的垂直运输机械为例,以合同清单漏洞为契机,依据实际情况分析计算补偿费用,同时强化工程产品品质,博得业主补偿意向,为公司增效创益。
This paper takes the vertical transport machinery in construction site of large commercial office building as an example and the contract list loopholes as opportunities,analyzes and calculating the compensation cost in actual situation,at the same time we strengthen the quality of engineering product,obtain the compensation intention from the owner,and create profits for company.
出处
《施工技术》
CAS
北大核心
2017年第S1期1093-1095,共3页
Construction Technology
关键词
垂直运输机械
清单漏洞
补偿费用
方法
vertical transport machinery
contract list loopholes
compensation cost
methods