超大荷载高耸塔架基础托换施工技术研究 被引量:2

Construction Technology Research of Large Load High-rising Steel Foundation Underpinning
下载PDF
导出
摘要 根据现场超大荷载高耸塔架、复杂地形地物、苛刻变形控制指标、众多条件约束等特点,提出人工挖孔灌注桩+新建大承台+新旧承台协同工作的技术方案,通过复杂环境下人工挖孔灌注桩施工技术、狭小密闭的空间下新承台大体积混凝土浇筑技术、新旧承台紧密结合技术,实现超大荷载高耸塔架基础的安全稳定的托换。 According to the characteristics of high tower,complex topography,severe deformation control index,many conditions and constraints,the paper puts forward a technical scheme for the manually excavated cast-in-place pile and new large bearing and the new and old contractors to work together,through the construction technology bored cast-in-place pile under complex environment,large volume concrete pouring technology of new bearing platform under small closed space,new and old bearing technology is closed combined,to realize the safe and stable replacement of the superlarge load tower foundation.
机构地区 中国人民解放军
出处 《施工技术》 CAS 2018年第S1期526-533,共8页 Construction Technology
关键词 大荷载 塔架 基础托换 large load tower foundation under pinning
  • 相关文献

参考文献2

二级参考文献12

共引文献17

同被引文献7

引证文献2

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部