期刊文献+

基于全过程造价理论的输变电工程结算管理研究 被引量:13

Research on Engineering Settlement Management of Power Transmission and Transformation Projects Based on Whole Process Cost Theory
下载PDF
导出
摘要 工程结算管理是电力工程造价管理中重要的一环。传统的结算管理模式侧重于预算和决算,过程管理中电力工程项目的结算编制连贯性强、工作量大,针对结算的过程管理缺乏有效的手段。因此,研究阶段性结算管理,进而提高工程造价管理水平具有重要的意义。从全过程造价管理的基本理论出发,通过对传统结算模式的缺陷和弊端进行剖析,将输变电工程项目的结算管理与全过程管理相结合,提出了输变电工程结算的全过程管控方法和体系,为电力工程建设的结算与管理工作提供有益的参考。 Engineering settlement management is an important part of the cost management of electric power projects.The traditional settlement management mode lays emphasis on budget and final accounts settlement,making the settlement a very heavy and complicated job,but lacks effective control means for the process management.Therefore,the research on stage-bystage settlement management is of great significance to improvement of the project cost management.Based on the theory of whole process cost management,through analyzing the defects and shortcomings of the traditional cost management and settlement mode,combining the engineering settlement and the whole process control,this paper proposes a new whole-process control method and system,which is expected to provide useful reference for the settlement and management of electric power projects.
作者 艾宪仓 岳铁军 彭露苇 AI Xiancang;YUE Tiejun;PENG Luwei(State Grid Gansu Economic Technology Research Institute,Lanzhou 730050,Gansu,China)
出处 《电网与清洁能源》 2019年第1期72-77,共6页 Power System and Clean Energy
基金 国网甘肃省电力公司科技项目(522728160018)~~
关键词 输变电工程 结算管理 全过程造价管理 power transmission and transformation project engineering settlement management whole process cost management
  • 相关文献

参考文献9

二级参考文献28

  • 1苏红专.输变电工程建设全过程造价控制管理探析[J].云南电业,2007(8):41-42. 被引量:5
  • 2吴韵侠,吴汉雄,樊国勋.工程造价影响因素分析[J].黄河水利职业技术学院学报,2002,14(4):41-42. 被引量:47
  • 3杨永刚,曹怡慎.分阶段结算在施工管理中的应用[J].建筑经济,2008,29(S2):359-360. 被引量:3
  • 4广东电力设计院:“赢得值”与接口“动态”项目管理[J].中国电力企业管理,2009(1). 被引量:1
  • 5郭戈.价值工程理论在电力工程造价可研中的应用.电网技术,2011,35(2):160-163.
  • 6HUANG Yi,HUANG Wen-jie,SHANG Yu-min.Cost Con-trol in the Design Stage of Transmit Electricity Projects Basedon Value Engineering Method[C].Proceedings of the 2009Second International Symposium on Knowledge Acquisitionand Modeling(KAM 2009),2009:308-311.
  • 7CHEN Man-ying,LIU Zhong.Cost control method and itsapplication for construction project in the design phase[C].Proceedings of the 2011 International Conference on RemoteSensing,Environment and Transportation Engineering(RSETE 2011),2011:1073-1076.
  • 8WANG Fei,YAN Ju-wei,SHEN Bing,et al.The Researchon Informatization of Construction Project Cost Control[C].Proceedings of the International Conference on InformationManagement Proceedings of the International Conference onInformation Management,2008:155-158.
  • 9LUO Sheng,LU Yu-jie,PENG Yong,et al.Developing CostControl Information System in the Complex Project[C].BMEI2011—Proceedings 2011 International Conference on BusinessManagement and Electronic Information,2011:99-105.
  • 10潘巍巍,方旭初.电网资产全寿命周期过程性管理及应用[M].北京:中国电力出版社,2013:22-25.

共引文献120

同被引文献138

引证文献13

二级引证文献37

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部