摘要
以黄骅港金港花园政和大酒店基础施工为例,介绍了振动沉管灌注桩的施工工艺、施工方法以及质量控制措施。
Taking the case of the foundation construction of Zhenghe Grand Hotel in the Golden Port Garden of Huanghua Harbor, this paper introduces the techniques, methods of construction and quality-control measures of vibration, immersed tube and pouring stakes.
出处
《河北建筑工程学院学报》
CAS
2002年第1期23-26,共4页
Journal of Hebei Institute of Architecture and Civil Engineering