摘要
通过青藏铁路涵洞试验工程的修筑和地温、变形、气温等相关项目的测试,经过对一个冻融循环过程观测数据以及针对试验工程中出现相关问题的综合分析,基本掌握了涵洞工程冻土问题的关键所在,提出了合理的建议和处理措施。
Based on the constructing of the Qinghai-Tibet Railway Experimental Culvert in permafrost region and the observation of ground temperature, distortion, air temperature and other relevant items. The data in one freezing-thawing circular are synthetically analyzed. Main problems in the experimental construction are also analyzed. Thus, the key problems of how to build culverts in the frozen soil regions are resolved, and some rational suggestions, as well as some disposal measures, are given.
出处
《冰川冻土》
CSCD
北大核心
2003年第B08期84-87,共4页
Journal of Glaciology and Geocryology
关键词
青藏铁路
涵洞
冻土
地温
上限
层上水
融沉
frozen soil
ground temperature
permafrost table
suprapermafrost water
thawing settlement