摘要
阐述了蒲河仲官村橡胶坝工程的总体布置和主要部位的设计过程,其中充排水系统的设计具有创新。在落差很大的情况下,利用陡坡形式完成了坝体与下游的连接,整个设计为类似工程提供了有价值的参考。
this paper is formulated detailedly the general arrangement and the design process of the main portion of Zhongguancun rubber dam,whose anchor form and system of filling and discharging water are with originality innovations.Under large head,it is utilized successfully the form of steep slop to connect the dam body with lower pool.All these designs provide similar engineering with valuable references.
出处
《黑龙江水专学报》
2003年第3期78-80,共3页
Journal of Heilongjiang Hydraulic Engineering College
关键词
橡胶坝
锚圈
充排水系统
rubber dam
anchor form
the system of filling and discharging water