摘要
结合工程图纸会审工作 ,从施工单位加强预审 ,各方共同参加会审 ,做好施工记录等方面进行了论述 ,指出了认真做好图纸会审工作 ,是保证工期 。
Combined with consultation trial of engineering drawings discussions are carried out according to preliminary trial, construction recording and other aspects. Author points out that the consultation trial of drawings is the fundamental measure to ensure the engineering quality and limit time.