期刊文献+

三峡永久船闸输水洞衬砌施工期温度与应力监测成果分析 被引量:18

Analysis of temperature and thermal stresses observations on concrete lining of water delivery tunnel of Three Gorges Project permanent shiplock
下载PDF
导出
摘要 介绍了三峡永久船闸输水隧洞衬砌混凝土温度与温度应力现场监测和裂缝观测成果.利用实测资料计算分析了输水隧洞衬砌混凝土边墙和顶拱的温度应力.采用弹性徐变温度应力理论分析了大型隧洞衬砌混凝土的温度与温度应力变化特点,并与实测值进行了比较.根据实测结果与理论分析,提出了大型隧洞衬砌混凝土施工期的温控有效措施:降低水化热温升、加强早期养护和冬季保温. Field observations on concrete temperature, thermal stress and cracks of concrete lining of water delivery tunnel of Three Gorges Project permanent shiplock are presented. The thermal stresses of side walls and umbrella arches are calculated based on field observations. Elasto-creeping thermal stress method is adopted to analyze the characteristics of temperature and thermal stress variations of concrete lining of large-scale tunnel; and the analyzing results are compared with the field observations. Based on field observations and FEM analysis, some effective temperature control measures are proposed as fallows: lowering temperature rise due to hydration heat; strengthening curing of lining concrete in early stage and keeping insulation in winter.
出处 《武汉大学学报(工学版)》 CAS CSCD 北大核心 2003年第5期30-34,共5页 Engineering Journal of Wuhan University
关键词 隧洞衬砌 温度应力 温度控制 concrete lining of tunnel thermal stress temperature control
  • 相关文献

同被引文献111

引证文献18

二级引证文献91

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部