摘要
本文通过对秦沈高速电气化铁道客运专线的接触网60 kg-38(QSJ-13-1)线岔设计特点分析,提出现场施工标准。介绍了该线岔在安装施工中采用先进的测量、施工机具,经正确安装与精心调整,保证了线岔良好的运行状态。
By analyzing the design characteristics of 60kg 38th OCS cross over in Qinhuangdao-Shenyang high speed special passenger line, the paper raises the criteria for site installation, introduces the modern measurement, construction machinery and tools adopted in installation and construction of this cross over with correct installation and careful adjustment that guarantee the normal operation of the cross over.
出处
《电气化铁道》
2003年第5期25-27,共3页
Electric Railway
关键词
高速电气化铁道
接触网
线岔调整
线岔设计
施工
High speed electrified railway
OCS construction
adjustment of 60kg 38^(th) cross over