摘要
分析重庆发电厂6KV系统母线短路的原因,并提出相应的对策,对6KV系统进行适当的改造,减少了事故机率。
Based on analysis of the bus short circuit of 6kv system in Chongqing power plant and to reduce the accident probability, the relevant counter- measures are provided to improve it.
出处
《重庆电力高等专科学校学报》
1999年第3期5-8,共4页
Journal of Chongqing Electric Power College