三峡水库汛末蓄水时间与目标决策研究 被引量:26

Study on the impounding time and objective decision of the  Three Gorges Project at the end of flood period
下载PDF
导出
摘要 针对三峡水库运行中存在的防洪、发电与航运之间的矛盾,研究了汛末不同蓄水方案下,三峡水库的防洪风险、发电以及上下游航运效益的变化情况;通过寻求水库防洪、发电及航运之间的相互关系,建立水库水沙联合调度模型,对三峡水库汛末蓄水时间和方式进行了多目标决策;应用加权均衡规划排序模型对非劣方案进行评价,给出了三峡水库汛末蓄水运行的最佳方案,为三峡工程正式建成后制定合理的调度运用方案提供科学依据。 To counter the contradictions among the electricity generation, flood control and navigation in the Three Gorges Project (TGP) operation, the flood risk and the benefit of generation and shipping in different impounding schemes was studied. The reservoir water sediment regulation multi-purpose decision model was developed according to the relationships among the flood risk, generation and shipping benefit. In order to study its optimum impounding time and mode, a weighted balance mode was applied to decide an optimum impounding scheme. The results can be used for the TGP operation.
出处 《水科学进展》 EI CAS CSCD 北大核心 2003年第6期682-689,共8页 Advances in Water Science
基金 国家自然科学基金 水利部联合资助项目(59890200)~~
关键词 三峡水库 蓄水 排序模型 调度模型 多目标决策 水沙调度 Decision making Navigation Optimization Power generation Reservoirs (water) Sediments Water
  • 相关文献

参考文献6

  • 1长江航道局.三峡工程施工期和175!m蓄水初期变动回水区碍航河段及整治措施的研究[R].武汉:长江航道局,2000..
  • 2水利部长江水利委员会.长江三峡水利枢纽初步设计报告[R].武汉:水利部长江水利委员会,1992..
  • 3水利部长江水利委员会.三峡工程泥沙研究[M].武汉:湖北科学技术出版社,1997..
  • 4高革命,陈惠源,万俊.白盆珠水库拦蓄洪水尾巴的风险分析[J].江西水利科技,1997,23(4):222-226. 被引量:3
  • 5水利部长江水利委员会.三峡工程综合利用与水库调度研究[M].武汉:湖北科学技术出版社,1997..
  • 6潘庆w 杨国录 府仁寿.三峡工程泥沙问题研究[M].北京:中国水利水电出版社,1999..

共引文献6

同被引文献234

引证文献26

二级引证文献163

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部