摘要
变电站设备的安装是变电站建设中的一个重要环节,然而由于变电站设备种类繁多,设计内容广泛,使施工和安装调试工作面临着较大的挑战。本文结合当前变电站的实际情况,对变电站设备的安装和调试中应注意的几个关键事项进行了详细探讨,以期提高安装施工质量,为电力系统安全、可靠的运行夯实基础。
The installation of substation equipment is an important part of substation construction, however, because there are many different kinds of substation equipment, design content is widespread, make the construction and installation and debugging work face greater challenges. In this paper, combined with the actual situation of current transformer substation, the transformer substation equipment installation and debugging in a few key issues that should be paid attention to has carried on the detailed discussion, in order to improve the quality of installation, for the operation of the power system safe, reliable, solid foundation.
出处
《电子测试》
2013年第11X期255-256,共2页
Electronic Test
关键词
变电站
设备安装
调试
注意事项
substation
Equipment installation
Debugging
Matters needing attention