摘要
本文以灰色系统理论中的关联度分析方法和建模原理为基础,建立了确定水电站群最优开发程序的方法.该方法具有决策过程直观、计算过程简单、决策结论可靠等特点.
In this paper,the grey system method of relational grade and model is adopted to optimize the development program of the hydropower stations.This method has the properties of decision process being clear,and computational process being simple,and decision result being reliable.
出处
《水电能源科学》
北大核心
1992年第1期58-67,共10页
Water Resources and Power
关键词
灰色系统
水电站群
程序
开发
grey system, grey relational analysis, ideal solution, negative-ideal solution, relational grade, grey similar analysis