本文对《浅谈预应力钢筋混凝土空心桩充气胶囊的定位》一文中的胶囊卡,通过进一步改进,使其能适应桩断面纵向主筋为16根时,充气胶囊的定位。
In regard to the article 'Positioning Control of Gas-filling Capsule for Prestressed Concrete Pipe Piles', published in the 'Journal of port & Waterway Engineering, No.7,1990', This paper makes further renovation on the Capsule fixture in order to make it adaptable to the positioning of gas-filling Capsule for pipe piles with 16 main longitudinal reinf orcements.