摘要
结合工作实践 ,对高层建筑中机械加压送风系统的设置部位进行了详尽的阐述 。
Based on the engineering practice, the article describes the installation position of mechanical pressurization system in high-rise building in great detail. It also discusses the related requirements in current building code.
出处
《消防科学与技术》
CAS
2003年第B10期16-18,共3页
Fire Science and Technology