期刊文献+

类矩形盾构六自由度串联型管片拼装机 被引量:5

Six DOF Series Segment Erector of Quasi-rectangular Shields
下载PDF
导出
摘要 管片拼装机是盾构机中的重要组成部分,直接关系到隧道施工的质量和效率。文章所述为借鉴工业机器人设计理念,研究设计出的一种液压驱动机械臂式六自由度管片拼装机。该拼装机基于机械臂的收缩和舒展,扩大了管片拼装运动范围,在满足类矩形断面隧道施工的同时,也可扩展应用于其它类似的异形断面隧道施工中。 As an important part of the shield,the segment erector directly affects the efficiency and quality of tunnel construction.With the continuous development of urban traffic in recent years,the engineering technology for the special-section tunnel that has higher space utilization develops rapidly,while the traditional segment erector of round shield is hardly adapted to the segment erection in special-section tunnels.The segment erector that proposed in this paper is a 6-DOF segment erector with hydraulically actuated mechanical arms taking references of the design concept of industrial robot.This erector expands the motion range of the segment erection by the contraction and stretching of mechanical arm,which can be further used in similar special-section tunnel construction besides satisfying the construction of quasi-rectangular section tunnels.
作者 庄欠伟 杨正
出处 《现代隧道技术》 EI CSCD 北大核心 2016年第S1期46-50,共5页 Modern Tunnelling Technology
基金 上海市科学技术委员会资助项目(No.14DZ1207900) 宁波市重大科技攻关资助项目(No.2015C110017)
关键词 类矩形盾构 隧道工程 管片拼装机 工业机器人 Quasi-rectangular shield Tunnel engineering Segment erector Industrial robot
  • 相关文献

参考文献4

二级参考文献46

  • 1刘平,戴燕超.矩形顶管机的研究和设计[J].市政技术,2005,23(2):92-95. 被引量:31
  • 2管会生,黄松和,徐济平.盾构管片拼装机设计研究[J].矿山机械,2005,33(3):15-16. 被引量:31
  • 3Naitoh K.The development of earth pressure balanced shie-lds in Japan[J].Tunnels & Tunnelling,1985,17(5):15-18.
  • 4李永刚,宋轶民,冯志友,张策.基于牛顿欧拉法的3-RPS并联机构逆动力学分析[J].航空学报,2007,28(5):1210-1215. 被引量:28
  • 5Daniele Vanni, Ernst Geutebruck. Leak detection in complex underground structures-Metro Station Gondar [ J ]. Rome: Austrian Engineer and Architect Magazine (Invited),2010.
  • 6Ashida S. Recent diaphragm wall construction system and machines: TRD method, chain cutter traverse motion type soil cement diaphragm wall method [ J]. Construction Ma- chinery and Equipment, 1999,35( 11 ) : 37 -42.
  • 7Oda K, Kaji S, Nakajima K, et al. Horizontal jet-mixing method for ground improvement[ C]// Soft Soil Engineer- ing, [s. 1. ]: Swets&-Zeiglinger, 2001:483-486.
  • 8Mitchell J K, Santamarina J C. Biological considerations in geotechnical engineering[ J]. J Geotech Geoenvir Eng,2005, 131 : 1222 - 1233.
  • 9Lambert J, Veenbergen V, Van der Hoek E,et al. Environ- ment biosealing: How micro-organisms become our little al- lies in repairing leaks [ J ]. lngeokring Newsletter,2004, I I (1): 9-12.
  • 10Iwai T, Nakashima K. Lowering the groundwater table by super well point method [ C ]// Proceedings of the 4th Annu- M Meeting of Particle Accelerator Society of Japan. Japan: 2007 : 874 - 876.

共引文献77

同被引文献34

引证文献5

二级引证文献53

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部