3Lauhoff H. Speed control on belt conveyor - Does it really saveenergy [J]. Bulk Solid Handling, 2005, 25 (6) : 368 ~ 377.
4ALLES, R. FSrdergurt - Berechnung ( Bulk materialcalculations). ContiTech, first edition 1979.
5HINT'Z, A. Einfluss des Gurtaufbaus auf den Energieverbrauch yon Gurff'rderanlagen ( Influence of the belt configuration on the energy consumption of belt conveyor systems). Thesis, Hanover University 1993.
6B. Van Den Heuvel. Investigationa dealing with variable - speed drives of belt conveyor system [ J ]. World of Mining, 2006 (2): 105-113.
7R. M. Horak. Improved Idler Panel Design for Pipe Conveyors[J].Bulk Solids Handling, 1997, 17(4):521~526.
8W. Engst. Rollgurtfoerderer fuer massenstroeme mit hoeherer geschwindigkeit bei steil ansteigender und kurviger streckenfuehrung[J]. Braunkohle, 1987, 39(7): 233~240