期刊文献+

矿床的三维地质建模及资源量估算:以都匀大梁子铅锌矿为例 被引量:8

3D geological modeling of deposits and reserve estimation:a case study of Daliangzi lead-zinc mine,Duyun
下载PDF
导出
摘要 本文以矿区已有的地质资料为基础,应用三维地质建模的思路,建立了都匀大梁子铅锌矿的地表模型、断层模型、勘探工程模型、矿体模型。用Surpac软件下的块体模型法和地质块段法对大梁子铅锌矿的(Ⅱ1、Ⅱ2、Ⅲ1、Ⅲ2号矿体)的资源量进行了估算,并对两种计算结果进行了比较分析。结果表明:三维地质块体模型法在计算块体资源量是要比传统的地质块段合理一些,其优势在于其可以直观地表现出矿体品位在三维空间的变化规律,可视化效果明显,并对后期的勘查和开发具有一定的指导意义。 This paper establishes the surface model,fault model,exploration engineering model,ore body model based on the theory of modern metallogenic prediction and the existing geological data of the mining area.Estimated the lead-zinc resource reserves of the Daliangzi lead-zinc mine by using the block model method and the geological block method by Surpac software,and Compare and analyze results shown that the three-dimensional geological block model method is more reasonable than the traditional geological block,and its advantage is that it can visually show the change rule of ore body grade in 3Dspace,and the visual effect is very obvious,and it will has a certain guiding significance for late development.
出处 《中国矿业》 北大核心 2017年第S1期302-309,共8页 China Mining Magazine
基金 贵州省地矿局局管科研项目资助(编号:2016[40])
关键词 大梁子铅锌矿 三维地质建模 SURPAC软件 储量计算 Daliangzi lead-zinc mine 3D geological modeling Surpac software reserve calculation
  • 相关文献

参考文献15

二级参考文献154

共引文献480

同被引文献125

引证文献8

二级引证文献31

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部