1Gregory A Howell. What is Lean Construction-1999 [ D]. CA: University of California, 1999.
2Gregory A Howell. CEC whitepaper: a new operating system for project management: consequences and opportunities [J]. Journal of Construction Engineering and Management, 2010 (11): 1-19.
3Yong-Woo Kim, Glenn Ballard. Is the earned-value method an enemy ofworkflow [EB/OL]. [2011-05-24]. http:// www. lean construction, org/pdf. 24. pdf.
4Yong-Woo Kim, Glenn Ballard. Management thinking in the earned value method system and the last planner system [J]. Journal of Management in Engineering, 2010 (10): 223-228.
5Rafael Sacks, Michael Harel. An economic game theory model of subcontractor resource allocation behavior [J]. Construction Management and Economics, 2006 (8) : 869-881.
7Sun Kai,Guo Wei.Airport business model with integrated servicesplatforms for transportation,commerce&information. Proceedings of the 2nd International Conference on Engineer-ing and Business Management . 2011
8Sun Kai,Guo Wei.Analysis on partners&customers of airportmanagement informatization. Proceedings of the2nd International Conference on Engineering and Business Man-agement . 2011
9Sun Kai,Weng Chio Lai.SARI:A common architecture for infor-mation systems planning. Proceedings of the2010 International Conference on Future Information Technology . 2010
10Sun Kai,Weng Chio Lai.Integrated passenger service system forairport based on SARI. Proceedings of the 2010International Conference on Future Information Technology . 2010