摘要 结合岩溶地区2根大直径人工挖孔灌注桩的静载荷试验和应力测试结果,对桩的荷载传递特性进行了详细的对比分析。用双曲线模型拟合了摩阻力与相对位移之间的关系。分析结果表明,桩端岩溶对桩承载特性的影响,主要表现为对整个桩身桩侧摩阻力的影响,对桩身上部主要影响其临界位移,对桩下部的临界位移和极限摩阻力皆有影响。 Based on the results of static load tests and stress tests for two large diameter cast-in-place piles in karst area,the load transfer behavior of piles is analyzed and compared. The relationship between shaft resistance and relative displacement is fitted with a hyperbolic model. According to the analysis results,the karst cave under pile-end mainly effects the shaft resistance around the whole piles. In the upper part of pile,only the critical displacement is affected while the critical displacement and limited shaft resistance are all effected in the lower part of the pile.
出处 《岩石力学与工程学报》 EI CAS CSCD 北大核心 2004年第5期809-813,共5页 Chinese Journal of Rock Mechanics and Engineering
关键词 岩溶 人工挖孔灌注桩 静载荷 应力测试 南盘江特大桥 摩阻力 端阻力 拟合 karst cave,cast-in-place pile,shaft resistance,base resistance,fitting
  • 相关文献

参考文献9

二级参考文献9

  • 1工程地质手册编写委员会.工程地质手册(第三版)[M].北京:中国建筑出版社,1992..
  • 2施峰 柳春 等.福州地区人工挖孔桩承载力的研究[M].福建省建筑科学研究院,1997,8..
  • 3黄经秋.某岩溶厂址大口钻孔嵌岩灌注桩基勘察及评价.岩土工程技术文集[M].西安:西安交通大学出版社,1988.258-266.
  • 4戴联筠.霍县电厂岩溶地其稳定性评价[M].太原:山西省电力勘测设计院,1996..
  • 5翟晋.自平衡测桩法的应用研究[M].东南大学,2000..
  • 6.建筑桩基技术规范(JGJ94-94)[M].北京:中国建筑工业出版社,1995..
  • 7施峰,福州地区人工挖孔桩承载力的研究,1997年
  • 8建筑地基基础勘察设计规范(福建省标准)DBJ13-07-91,1992年
  • 9施峰,蔡来炳,柳春.人工挖孔扩底桩承载力试验研究[J].工程勘察,1999,27(2):21-25. 被引量:23

共引文献596

同被引文献253

引证文献41

二级引证文献256

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部