期刊文献+

大跨度斜拉桥索梁锚固中的非线性接触问题 被引量:40

Research on nonlinear contact problem of cable-beam anchorage for long-span cable-stayed bridge
下载PDF
导出
摘要 采用非线性接触单元来模拟大跨度斜拉桥索梁锚固区垫板与承压板之间不焊接的紧压密贴关系,分析了大跨度斜拉桥索梁锚固中的非线性接触问题。计算结果与国外一些大跨度斜拉桥锚固区模型试验结果进行了比较,结果较为吻合,而计算方法更为先进。分析结果与提出的另一种简化计算方法———等效板厚法进行了比较,发现除垫板和承压板的局部外,两种方法计算结果接近;等效板厚法可用于初步设计时选型、初算,而非线性接触方法可用于最终计算及指导模型试验。 The nonlinear contact finite element is adopted to simulate the state that the anchorage frame and setting plate of cable-beam anchorage joint of long-span cable-stayed bridge is not welded each other. The nonlinear contact problem is described in detail. The result is in the same with model test result made by overseas academician;moreover the method adopted here is more advanced. Compared with the simplified method presented in this paper--equivalent plate thickness method,it is indicated that both methods are in the same except for the local area of anchorage frame and setting plate. The equivalent plate thickness method can be used in choosing type and rough calculating in primary design. The nonlinear contact method can be used in final calculating and guiding model test.
作者 颜海 范立础
出处 《中国公路学报》 EI CAS CSCD 北大核心 2004年第2期46-49,共4页 China Journal of Highway and Transport
关键词 桥梁工程 索梁锚固 非线性接触单元 斜拉桥 钢结构 局部应力 bridge engineering cable-beam anchorage nonlinear contact finite element cable-stayed bridge steel structure local stress
  • 相关文献

参考文献5

二级参考文献3

共引文献74

同被引文献171

引证文献40

二级引证文献303

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部