承包商承包工程有一定的风险,成本、进度和质量是工程项目中的三个主要变数,而施工进度是最敏感,包括很多不确定性因素。文章介绍了风险源、风险估计及风险的评价方法。
The contractor contracting the project has a certain risk. The cost, The rate of progress and the quality have three main variables in the project, the progress rate of construction is susceptiblest, it includes many uncertain factors. The paper introduces the source of risk, the assessment of risk and the evaluation method of risk.
出处
《东北水利水电》
2004年第5期32-34,共3页
Water Resources & Hydropower of Northeast China
关键词
承包商
施工进度
风险分析
contractor
progress rate of construction
risk analysis