摘要
全断面隧道掘进机(TBM)是集机械化、自动化和管理现代化为一体的复杂系统,对这个系统中的各主要环节进行严格质量控制与管理是非常重要的。以实际工程为例,全面论述了TBM 施工中的洞轴线方向、管片生产、管片安装、豆砾石回填与灌浆、监测工程等主要环节实施的严格质量控制与管理以及所取得的良好施工效果,对类似工程施工有一定的借鉴作用。
TBM is a very complex system that involves machinization, automatization and modern management, so it is very important to manage and control the key links of this system with high quality. In the Tunnel No.7 of YRDP ICB Connection Works, the request of control and management is very strict about the tunnel excavation axis, segment production, segment installation, pea-gravel backfill, grouting and monitoring, The measures to meet the request are presented and they are good reference for other similar projects.
出处
《岩石力学与工程学报》
EI
CAS
CSCD
北大核心
2004年第11期1930-1934,共5页
Chinese Journal of Rock Mechanics and Engineering
关键词
隧道工程
TBM
施工
质量控制
Management
Quality control
Tunneling (excavation)