顶管施工中注浆减摩作用机理的研究 被引量:111

Research on mechanism of reducing friction through injecting slurry in pipe jacking
下载PDF
导出
摘要 长距离顶管施工中为减小顶进阻力通常采用注浆减摩措施。研究了注浆材料及其性能,对注浆过程中浆液与管道以及周围土体之间的相互作用机理进行了分析,探讨了浆液在土体中的渗流以及注浆对土层移动的影响,提出了注浆时应注意的几个问题。 Injecting slurry is usually used to reduce the jacking friction in long-distance pipe jacking. The material of slurry and its property are studied. The reciprocal-action mechanism of soil and mud slurry around pipe in the course of injecting slurry is investigated. The seepage behavior of mud slurry on soil around pipe and the influence of injection on soil movements are discussed, and several problems which should be paid attention to in injecting slurry are put forward.
出处 《岩土力学》 EI CAS CSCD 北大核心 2004年第6期930-934,共5页 Rock and Soil Mechanics
关键词 顶管 注浆减摩 膨润土泥浆 渗流 Seepage Slurries Soils
  • 相关文献

参考文献10

  • 1Jancsecz S, Steiner W. Face support for a large mix-shield in heterogeneous ground conditions[A]. Tunnelling 94, conference proeedings, Institution of Mining and Metallurgy and British Tunnelling Society[C]. London: Chapman and Hall, 1994. 531 -549.
  • 2Jefferis S A. Slurrids, Grouts. Chapter 48 of Construction Materials Reference Book[M]. Doran D K. Oxford:Butterworth- Heinemann, 1992.
  • 3Anagnostou, G. and Kovari, K. Face stability in slurry and EPB shield tunneling[J]. Tunnels and Tunnelling, 1996, 28(12): 27-29.
  • 4Milligan G W E, Norris P. Pipe-soil interaction during pipe jacking. Proceedings of the Institution of Civil Engineers[J]. Geotechnicai Engineering, 1999, 137(1): 27-44.
  • 5李万才.大口径长距离顶管工程注浆减摩技术[J].管道技术与设备,2000(6):11-13. 被引量:37
  • 6余彬泉 陈传灿.项管施工技术(第一版)[M].北京:人民交通出版社,1998..
  • 7黄宏伟,胡昕.顶管施工力学效应的数值模拟分析[J].岩石力学与工程学报,2003,22(3):400-406. 被引量:148
  • 8马·谢尔勒.项管工程[M].北京:中国建筑工业出版社,1983..
  • 9魏纲,温晓贵.不同顶管施工工艺对深层土体移动的影响分析[J].施工技术,2003,32(1):52-54. 被引量:6
  • 10候学渊 钱达仁 杨林德.软土工程施工新技术[M].合肥:安徽科学技术出版社,1999..

二级参考文献9

共引文献188

同被引文献418

引证文献111

二级引证文献468

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部