This paper mainly introduces the design, construction and operation results of Ankara Wastewater Treatment Plant, which was financed by German loan and put into operation in August 1997.
文摘This paper mainly introduces the design, construction and operation results of Ankara Wastewater Treatment Plant, which was financed by German loan and put into operation in August 1997.