Design,installation and commissioning of the ELI-Beamlines high-power,high-repetition rate HAPLS laser beam transport system to P3
1
作者 S.Borneis T.Laštovickaˇ +15 位作者 M.Sokol T.-M.Jeong F.Condamine O.Renner V.Tikhonchuk H.Bohlin A.Fajstavr J.-C.Hernandez N.Jourdain D.Kumar D.Modranskýˇ a.pokorný A.Wolf S.Zhai G.Korn S.Weber 《High Power Laser Science and Engineering》 SCIE CAS CSCD 2021年第2期215-240,共26页
The design and the early commissioning of the ELI-Beamlines laser facility’s 30 J,30 fs,10 Hz HAPLS(High-repetitionrate Advanced Petawatt Laser System)beam transport(BT)system to the P3 target chamber are described i... The design and the early commissioning of the ELI-Beamlines laser facility’s 30 J,30 fs,10 Hz HAPLS(High-repetitionrate Advanced Petawatt Laser System)beam transport(BT)system to the P3 target chamber are described in detail.It is the world’s first and with 54 m length,the longest distance high average power petawatt(PW)BT system ever built.It connects the HAPLS pulse compressor via the injector periscope with the 4.5 m diameter P3 target chamber of the plasma physics group in hall E3.It is the largest target chamber of the facility and was connected first to the BT system.The major engineering challenges are the required high vibration stability mirror support structures,the high pointing stability optomechanics as well as the required levels for chemical and particle cleanliness of the vacuum vessels to preserve the high laser damage threshold of the dielectrically coated high-power mirrors.A first commissioning experiment at low pulse energy shows the full functionality of the BT system to P3 and the novel experimental infrastructure. 展开更多
关键词 beam transport system CLEANLINESS high-power laser laser commissioning laser-plasma experiment OPTOMECHANICS stability X-ray user facility
原文传递
上一页 1 下一页 到第
使用帮助 返回顶部