期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
Optimization of gas lift system for well performance improvement in Asmari formation:A techno-economic perspective
1
作者 Hari Sreenivasan Jash Patel +3 位作者 Dev Jain Setu Patel Isaac Wilson shanker krishna 《Petroleum Research》 EI 2024年第1期115-124,共10页
Well productivity in the Asmari carbonate formation of southwest Iran has decreased in recent years as a result of production issues.The production rate must be maintained below 1500 STB/day to prevent water coning.In... Well productivity in the Asmari carbonate formation of southwest Iran has decreased in recent years as a result of production issues.The production rate must be maintained below 1500 STB/day to prevent water coning.In this study,a gas lift well is modeled using data from one of the producing wells of this field.Nodal analysis is performed using lift-gas injection rates and wellhead pressures at different reservoir pressures and water cut conditions to optimize production.Economic aspects are considered to optimize the artificial gas injection rates at different tubing head pressures and water cut conditions.Increasing the lift-gas injection rate from 0.4 MMscf/day to 1 MMscf/day enhances the oil production rate by 37.71%and 43.89%for 10%and 30%water cut conditions,respectively.Gas injection rates of 5.2 MMscf/day and 5.4 MMscf/day are determined to be economically optimal for 30%water cut with tubing head pressures of 260 psig and 270 psig,respectively. 展开更多
关键词 Production enhancement Artificial lift Gas lift Asmari carbonate formation Techno-economic analysis Well productivity
原文传递
Influence of wellhead pressure and water cut in the optimization of oil production from gas lifted wells 被引量:2
2
作者 S.Hari shanker krishna +2 位作者 Manav Patel Pooja Bhatia Rakesh Kumar Vij 《Petroleum Research》 2022年第2期253-262,共10页
The worldwide increase in energy demand necessitates the development and optimization of marginal oil fields for sustenance.In this regard,effective and economic production of fluids are heavily relied upon the artifi... The worldwide increase in energy demand necessitates the development and optimization of marginal oil fields for sustenance.In this regard,effective and economic production of fluids are heavily relied upon the artificial lift techniques as the reservoir's natural energy may not be able to deliver the fluids to the surface.Gas lift is a widely practised and successful method that is suitable for rejuvenating the oil production from such fields.In this study,the influence of critical parameters like water cut,wellhead pressure(WHP)and gas-lift gas injection rate on the output from a gas lifted well was analysed.A significant reduction in the oil production was observed with the increase in water cut.For a fixed gas injection rate of 1 Mmscf/day,the production decreased by 26.90%when the water cut increased from 15%to 30%and further by 50.80%when the water cut reached 45%.An increase in the gas injection rate from 1 Mmscf/day to 8 Mmscf/day resulted in an increase in the production rate by 29.21%,40.48%and 56.56%for 15%,30%,and 45%water cut conditions,respectively.It was observed that there is a drop in the oil rate with the increase in WHP for a constant gas injection rate.An increase in the WHP from 100 psi to 300 psi resulted in a drop in the oil production rate by 11.01%,11.78%and 12.74%for 15%,30%and 45%water cut conditions,respectively.The study sheds light on the significance of optimizing the critical parameters to maximize the production from a well,with severely affected productivity,using a continuous gas lift system. 展开更多
关键词 Artificial lift Continuous gas lift PRODUCTIVITY Water cut Wellhead pressure
原文传递
上一页 1 下一页 到第
使用帮助 返回顶部