Tender price indices (TPI) remain an optimum process for predicting tender prices. There have been several indices’ developments in the Ghanaian Building Industry (GBI) to help in cost management practices, for insta...Tender price indices (TPI) remain an optimum process for predicting tender prices. There have been several indices’ developments in the Ghanaian Building Industry (GBI) to help in cost management practices, for instance, building cost indices, and material indices among others. Notwithstanding, there are no indices for forecasting tender price at the design stage of building projects in the Ghanaian Building Industry. The motivation of this study is to develop tender price indices that would facilitate easy prediction of the initial cost of building projects. Through a thorough literature review and secondary data collection, the index was formulated using Laspeyres with Excel spreadsheet for the actual index. The variables considered include preliminaries and measured work sections which include the substructure, concrete work, reinforcement, masonry, lining/sheathing, window/door/stairs, metalwork, surface finishes, sanitary appliances/fitting and electrical supply/power light system of the Bills of Quantities. The finding of the study shows that on average there is a change in price of about 4.42 per cent within the eight-year period from 2008 to 2016. The study has developed tender price indices for the Ghanaian Building industry for the facilitation of the easy prediction of the tender prices at the initial design stage, however, the indices have an error margin of ±3. The development of these indices will serve as the basis for further development of other indices in GBI such as locational indices and value-based indices for effective cost management practices.展开更多
Construction causative nuisances, inconveniences, interferences and disruptions to the routine economic and social life patterns of adjacent or neighboring communities are referred to as social cost. This study explor...Construction causative nuisances, inconveniences, interferences and disruptions to the routine economic and social life patterns of adjacent or neighboring communities are referred to as social cost. This study explores the understanding and level of consideration of social cost by construction professionals in Ghana. Relevant literature sources are reviewed to define, rationalize and classify social cost. The study used the survey approach with a set of questionnaires addressed to construction contractors and professionals to gather the data. It was realized that not much consideration is given to social cost at the tender stage of the construction process. The five factors hindering social cost inclusion in tendering are “difficulty in allocating social costs”, “governmental interferences”, “lack of historical data”, “lack of appreciation of social costs” and “low stakeholder agitation”. The paper advocated for integration of social cost into the tendering process. The study will serve as a foundation to design a social cost assessment system at the pre-contract stage.展开更多
文摘Tender price indices (TPI) remain an optimum process for predicting tender prices. There have been several indices’ developments in the Ghanaian Building Industry (GBI) to help in cost management practices, for instance, building cost indices, and material indices among others. Notwithstanding, there are no indices for forecasting tender price at the design stage of building projects in the Ghanaian Building Industry. The motivation of this study is to develop tender price indices that would facilitate easy prediction of the initial cost of building projects. Through a thorough literature review and secondary data collection, the index was formulated using Laspeyres with Excel spreadsheet for the actual index. The variables considered include preliminaries and measured work sections which include the substructure, concrete work, reinforcement, masonry, lining/sheathing, window/door/stairs, metalwork, surface finishes, sanitary appliances/fitting and electrical supply/power light system of the Bills of Quantities. The finding of the study shows that on average there is a change in price of about 4.42 per cent within the eight-year period from 2008 to 2016. The study has developed tender price indices for the Ghanaian Building industry for the facilitation of the easy prediction of the tender prices at the initial design stage, however, the indices have an error margin of ±3. The development of these indices will serve as the basis for further development of other indices in GBI such as locational indices and value-based indices for effective cost management practices.
文摘Construction causative nuisances, inconveniences, interferences and disruptions to the routine economic and social life patterns of adjacent or neighboring communities are referred to as social cost. This study explores the understanding and level of consideration of social cost by construction professionals in Ghana. Relevant literature sources are reviewed to define, rationalize and classify social cost. The study used the survey approach with a set of questionnaires addressed to construction contractors and professionals to gather the data. It was realized that not much consideration is given to social cost at the tender stage of the construction process. The five factors hindering social cost inclusion in tendering are “difficulty in allocating social costs”, “governmental interferences”, “lack of historical data”, “lack of appreciation of social costs” and “low stakeholder agitation”. The paper advocated for integration of social cost into the tendering process. The study will serve as a foundation to design a social cost assessment system at the pre-contract stage.