期刊文献+
共找到14篇文章
< 1 >
每页显示 20 50 100
An Experimental Study on the Behavior of Shear Keys According to the Curing Time of UHPC 被引量:7
1
作者 Hee Seok Kim won jong chin +2 位作者 Jeong Rae Cho Young Jin Kim Hyejin Yoon 《Engineering(科研)》 2015年第4期212-218,共7页
Precast segmental construction has been recently developed to reduce the construction cost and shorten the construction term as compared to the cast-in-place method in a will to establish the design and erection syste... Precast segmental construction has been recently developed to reduce the construction cost and shorten the construction term as compared to the cast-in-place method in a will to establish the design and erection system of structures using Ultra High Performance Concrete (UHPC). However, this method requires the presence of segmental joints to transfer the loads between neighboring segments, which stresses the importance of securing structural safety and serviceability. Therefore, need is for research on the behavior of the segmental joint for the structures erected by the precast segmental construction method. To that goal, this paper presents an experimental study on the behavior of shear keys with respect to the curing time of UHPC in the segmental joint. Analysis is done on the load-displacement relation according to the curing time of the shear keys and on the failure modes of the shear keys according to the cracking pattern at failure. 展开更多
关键词 Ultra High Performance Concrete PRECAST SEGMENTAL Joint CURING Time SHEAR KEY
下载PDF
Dynamic Characteristics Evaluation of Innovative UHPC Pedestrian Cable Stayed Bridge 被引量:5
2
作者 won jong chin Young Jin Kim +1 位作者 Jeong-Rae Cho jong Sup Park 《Engineering(科研)》 2012年第12期869-876,共8页
KICT (Korea Institute of Construction Technology) is conducting a project called “SUPER BRIDGE 200—Development of Low Cost and Long Life Hybrid Cable Stayed Bridge”. This project aims to reduce the construction and... KICT (Korea Institute of Construction Technology) is conducting a project called “SUPER BRIDGE 200—Development of Low Cost and Long Life Hybrid Cable Stayed Bridge”. This project aims to reduce the construction and main- tenance costs of long-span bridges by 20% and double their lifetime through the exploitation of ultra-high performance concrete (UHPC). This paper presents the design and construction of the first pedestrian cable stayed bridge using UHPC developed by KICT. UHPC, compared to conventional concrete, has not only high compressive and tensile strengths but also high ductility. The UHPC developed at KICT is a steel fiber-reinforced cement compound presenting design compressive strength larger than 180 MPa and design tensile strength exceeding 10 MPa with water-to-binder ratio below 0.24 and admixing of 2 volume percentage of steel fiber. To show the applicability of UHPC to structures, a pedestrian cable stayed bridge (Super Bridge I) exploiting the characteristics of the developed UHPC has been planned, designed and erected at KICT. The dimension of UHPC deck is 2.7 m × 7 m as a precast segment with a typical thickness of deck of only 7 cm. However, harmful crack was observed in the deck at the time of the fabrication of the deck segments. Accordingly, new fabrication method was conceived and applied to prevent cracking of the UHPC slender deck. Four UHPC deck segments were fabricated successfully without any crack. After construction, the dynamic characteristics (natural frequencies and mode shapes) were evaluated through vibration tests since several users felt excess vibration. A vertical tuned mass damper (TMD) was proposed and installed on the parapet of the bridge. The TMD reduces the acceleration by about 30% from 0.0316 g to 0.0244 g when two pedestrians are crossing the bridge. 展开更多
关键词 UHPC PEDESTRIAN CABLE Stayed BRIDGE Dynamic Characteristics Test TMD
下载PDF
Conceptual Design of Hybrid Cable-Stayed Bridge with Central Span of 1000 m Using UHPC 被引量:3
3
作者 Hyejin Yoon won jong chin +2 位作者 Hee Seok Kim Moon Seoung Keum Young Jin Kim 《Engineering(科研)》 2013年第9期744-750,共7页
Ultra-high performance concrete (UHPC) is featured by a compressive strength 5 times higher than that of ordinary concrete and by a high durability owing to the control of the chloride penetration speed by its dense s... Ultra-high performance concrete (UHPC) is featured by a compressive strength 5 times higher than that of ordinary concrete and by a high durability owing to the control of the chloride penetration speed by its dense structure. The high strength characteristics of UHPC offer numerous advantages like the reduction of the quantities of cables and foundations by the design of a lightweight superstructure in the case of the long-span bridge preserving its structural performance through axial forces and structures governed by compression. This study conducted the conceptual design of a hybrid cable-stayed bridge with central span of 1000 m and exploiting 200 MPa-class UHPC. The economic efficiency of the conceptual design results of the hybrid cable-stayed bridge with central span of 1000 m and of Sutong Bridge, the longest cable-stayed bridge in the world, was analyzed. 展开更多
关键词 Ultra-High Performance Concrete UHPC CABLE-STAYED BRIDGE 200 MPa-Class Sutong BRIDGE
下载PDF
Rolling Fatigue Test of Large-Sized UHPC Member for Cable Stayed Bridge 被引量:2
4
作者 Jeong-Rae Cho Young Jin Kim +2 位作者 jong Sup Park Eun Suk Choi won jong chin 《Engineering(科研)》 2012年第10期646-654,共9页
Recently, research strives to apply Ultra High Performance Concrete (UHPC) to large-sized structures owing to its remarkable mechanical performance and durability compared to normal concrete. The Korea Institute of Co... Recently, research strives to apply Ultra High Performance Concrete (UHPC) to large-sized structures owing to its remarkable mechanical performance and durability compared to normal concrete. The Korea Institute of Construction Technology proposed SuperBridge800, an edge girder type UHPC cable stayed bridge with central span of 800 m, through its detailed design. The bridge is designed to be erected through the connection of precast UHPC segments. The precast UHPC segment is monolithically composed of one ribbed deck slab and edge girders at each side. The connection between the precast segments is achieved by steel bars at the edge girders and by UHPC cast-in-place wet joint at the slab. Despite of the outstanding mechanical performance of UHPC, the fabrication of large-sized members is a difficult task since UHPC hardens faster than normal concrete and requires a special curing process. Therefore, the constructability of large-sized UHPC segment should be secured to achieve SuperBridge800. Besides, the performance of the connection between segments should also be guaranteed, especially in terms of the fatigue performance of the UHPC cast-in-place joint, which constitutes a weak point. To that goal, two half-scaled UHPC segments are manufactured and the constructability is examined by fabricating a large-sized UHPC member connected with respect to the design conditions. This study conducts rolling fatigue test on the so-fabricated large-sized UHPC member. Rolling fatigue test is carried out up to 2 million cycles considering actual vehicle load at each center and quarter points of the member. The test results confirm that the service limit state is satisfied. 展开更多
关键词 UHPC CABLE Stayed BRIDGE ROLLING FATIGUE Test Large-Sized UHPC MEMBER
下载PDF
Development of Optimal Structural System for Hybrid Cable-Stayed Bridges Using Ultra High Performance Concrete 被引量:1
5
作者 Hee Seok Kim Young Jin Kim +1 位作者 won jong chin Hyejin Yoon 《Engineering(科研)》 2013年第9期720-728,共9页
This study developed an optimal structural system for the hybrid cable-stayed bridge expected to have a durable lifetime of 200 years and of which major structural members are made of ultra high performance concrete (... This study developed an optimal structural system for the hybrid cable-stayed bridge expected to have a durable lifetime of 200 years and of which major structural members are made of ultra high performance concrete (UHPC) with 200 MPa-class compressive strength. This innovative cable-stayed bridge system makes it possible to reduce each of the construction and maintenance costs by 20% compared to the conventional concrete cable-stayed bridge by improving significantly the weight and durability of the bridge. Therefore, detail design is carried out considering a real 800 m cable-stayed bridge and the optimal structure of the hybrid cable-stayed bridge is proposed and verified. 展开更多
关键词 HYBRID CABLE-STAYED Bridge Ultra High Performance Concrete (UHPC) OPTIMAL Structural System DURABILITY
下载PDF
Development of Highly Efficient Construction Technologies for Super Long Span Bridge 被引量:1
6
作者 Hee Seok Kim Young Jin Kim +1 位作者 won jong chin Hyejin Yoon 《Engineering(科研)》 2013年第8期629-636,共8页
This paper presents highly efficient cable erection equipments and methods related to the construction of super-long-span bridges, construction technology of high towers and, technology for offshore foundations curren... This paper presents highly efficient cable erection equipments and methods related to the construction of super-long-span bridges, construction technology of high towers and, technology for offshore foundations currently developed through a R&D on accelerated and cost-saving construction technology for long-span cable bridges to secure our international competitiveness. In the field of cable erection technology, AS and PPWS equipments for highly efficient erection of cable longer than 2000 m, world-class clamping bolt tensioning equipment and shape control system for super-long cable are under development. The technologies developed in the domain of construction of towers are tapered slip form system for the construction of 400 m high tower, shape and erection precision control of elevated tower and, lightweight and modular formwork for slip form system. In the domain of foundation construction, remote controlled survey equipment and analysis system for water-depth of 100 m and depth of 50 m, prediction and evaluation technology of optimal load carrying capacity and settlement complying with international standard and, highly efficient hybrid foundation construction technology suitable for ground acceleration of 0.5 g and deep soft soil are currently developed. 展开更多
关键词 AS EQUIPMENT PPWS EQUIPMENT SLIP FORM System Large Scale FOUNDATION
下载PDF
Experimental Study on Innovative Slip Form Method for the Construction of Tapered Concrete Pylon of Long-Span Cable Bridge
7
作者 Hee Seok Kim Young Jin Kim +1 位作者 won jong chin Hyejin Yoon 《Engineering(科研)》 2014年第10期633-643,共11页
The construction of the three-dimensionally shaped pylons higher than 400 m requires a very high technological degree. It is known that the application of the tapered slip form method for the erection of the concrete ... The construction of the three-dimensionally shaped pylons higher than 400 m requires a very high technological degree. It is known that the application of the tapered slip form method for the erection of the concrete pylon of long-span cable bridges offers the advantage of being significantly faster than applying the auto-climbing system (ACS) form method. Therefore, this study presents the development of an innovative slip form system for pylons with tapered cross-section. Surface wave inspection system is applied for the determination of slip-up time, wireless hydraulic control system is applied for auto rising, GPS system is used to manage the pylon configuration, and lightweight GFRP (Grass Fiber Reinforced Plastic) panels are applied in the slip form system. Small-scale tests were conducted three times to validate the performance of the developed core technologies, and full-scale tests were conducted twice to validate and verify the developed innovative slip form. The full-scale tapered concrete pylons have hollow shafts and a height of 10 m. The sectional dimensions are varied according to the construction height. The experimental constructions of the tapered pylons using the innovative slip form were conducted successfully. This system is the world’s first application of GFRP slip form panel. 展开更多
关键词 SLIP Form SYSTEM Surface Wave Inspection SYSTEM Wireless Hydraulic Control SYSTEM PYLON Configuration LIGHTWEIGHT GFRP Panel
下载PDF
Computation of Impact Factor of High-Speed Railway Bridge by KTX Train Riding Test
8
作者 Hyejin Yoon won jong chin +2 位作者 Jae Yoon Kang jongwon Kwark Eui-Seung Hwang 《Engineering(科研)》 2013年第9期751-755,共5页
The design live load of railway is divided into common railway and high-speed railway separately inKorea. Accordingly, the Korean design specification of railway specifies the impact factor for common railway and high... The design live load of railway is divided into common railway and high-speed railway separately inKorea. Accordingly, the Korean design specification of railway specifies the impact factor for common railway and high-speed railway respectively. The impact factor for high-speed railway is based on Eurocode. Since the impact factor criteria inKoreawere established by adopting those of the Eurocode and without dedicated investigation relying on research results reflecting the domestic circumstances, thorough examination should be implemented on these criteria. Therefore the evaluation of impact factor based on field tests is required. Both dynamic and static vertical displacements are necessary to compute the impact factor. The dynamic response can be obtained from the measurement of deflection of the bridge slab crossed by the firstKoreahigh-speed train (KTX, Korea Train eXpress) running at high-speed. The main difficulties encountered are in obtaining static response because static response corresponds to the response of the bridge when the train remains immobile on the bridge or crosses the bridge at speed slower than5 km/hr. This study introduces the static response derived by applying the moving average method on the dynamic response signal. To that goal, field measurements was conducted under train speeds of5 km/hr and ranging from100 km/hr to300 km/hr on Yeonjae Bridge located in the trial section of the Gyeonbu High-Speed Railway Line before its opening. The validity of the application of the moving average method is verified from comparison of measured static response and derived static response by moving average method. Moreover, evaluation is conducted on the impact factor computed for a bridge crossed by the KTX train running at operational speed. 展开更多
关键词 HIGH-SPEED RAILWAY Dynamic Response Impact Factor MOVING AVERAGE Method
下载PDF
Development of an Efficient Tapered Slip-Form System Applying BIM Technology
9
作者 Hyejin Yoon won jong chin +1 位作者 Hee Seok Kim Young Jin Kim 《Engineering(科研)》 2013年第9期693-699,共7页
Slip-form system constitutes the latest technology for the erection of elevated concrete pylons. This paper investigates the design of slip-form system applying BIM technology for the efficient development of the slip... Slip-form system constitutes the latest technology for the erection of elevated concrete pylons. This paper investigates the design of slip-form system applying BIM technology for the efficient development of the slip-form system. The considered pylon has a height of 10 m and presents the rectangular hollow section generally adopted in cable-supported bridges. The slip-form was thus designed to accommodate the tapered cross-section and changing thickness considering the continuous placing of concrete. In addition, the safety of the system was examined with regard to the various loads applied on the slip form along the construction. The design results could be verified visually through BIM and the applicability of the designed slip-form was validated in advance through virtual assembly and construction. 展开更多
关键词 SLIP FORM System Construction of CONCRETE Pylons BIM
下载PDF
Load-Measuring Pot Bearing with Built-In Load Cell —Part II: Fatigue Performance and Experimental Temperature Correction
10
作者 Jeong-Rae Cho Young Jin Kim +3 位作者 jong-won Kwark Sung Yong Park won jong chin Byung-Suk Kim 《Engineering(科研)》 2013年第11期881-886,共6页
This paper presents the results of fatigue performance tests performed up to 10 million cycles on a load-measuring pot bearing with built-in load cell to verify its field applicability and proposes an empirical temper... This paper presents the results of fatigue performance tests performed up to 10 million cycles on a load-measuring pot bearing with built-in load cell to verify its field applicability and proposes an empirical temperature correction formula. In Part I of this work, various measurement performances of the load-measuring pot bearing were evaluated through static and dynamic loading tests. Bridge bearings are subjected to the effect of fatigue caused by the repeated application of moving loads and exposed to harsh site conditions including cold and hot weathers differently to laboratory conditions. Accordingly, the durability of the load-measuring pot bearing with built-in load cell shall be secured and the environmental effects like temperature shall be minimized for its application on field. This study conducted fatigue tests up to 10 million cycles on a load-measuring pot bearing with the capacity of 1000 kN to examine eventual degradation of the measurement accuracy with respect to the number of fatigue loading cycles. In addition, the experimental temperature correction procedure is proposed to obtain the temperature correction formula enabling to correct the effect of temperature on the load measurement. 展开更多
关键词 POT BEARING Load-Measuring LOAD Cell FATIGUE Temperature Correction
下载PDF
A Study on the Quality Control of Concrete during the Slip Form Erection of Pylon
11
作者 Hyejin Yoon won jong chin +1 位作者 Hee Seok Kim Young Jin Kim 《Engineering(科研)》 2013年第8期647-655,共9页
The construction market of super-high-rise buildings and long-span bridges has recognized unprecedented expansion owing to the development of high performance and high strength materials and the advances achieved in t... The construction market of super-high-rise buildings and long-span bridges has recognized unprecedented expansion owing to the development of high performance and high strength materials and the advances achieved in the design and construction technologies. In parallel to the lengthening and enlargement in scale of the structures, securing quality control technology of concrete while reducing the construction duration using improved construction methods emerges as a critical problem for concrete structures. In the erection of concrete pylons, slip forming represents the latest method offering the advantage of reducing drastically the construction duration compared to other methods by adopting automated slip-up of the forms and enabling 24-hour continuous placing. This study determines the slip-up time of the slip form by evaluating the early strength through the surface wave velocity and develops lightweight GFRP form in order to secure the quality of concrete during the slip form erection of pylons. A slip form system is fabricated and mockup test is conducted to verify the performances of the developed techniques through the construction of 10 m-high pylon with a hollow section. 展开更多
关键词 SLIP FORM System Construction of CONCRETE Pylons GFRP FORM
下载PDF
Comparison of Measured and Dynamic Analysis Vertical Accelerations of High-Speed Railway Bridges Crossed by KTX Train
12
作者 Hyejin Yoon won jong chin +2 位作者 Jeong-Rae Cho Jae Yoon Kang jongwon Kwark 《Engineering(科研)》 2013年第9期756-763,共8页
Since high-speed railway bridges are subjected to cyclic loading by the continuous wheel loads traveling at high speed and regular spacing, their dynamic behavior is of extreme importance and has significant influence... Since high-speed railway bridges are subjected to cyclic loading by the continuous wheel loads traveling at high speed and regular spacing, their dynamic behavior is of extreme importance and has significant influence on the riding safety of the trains. To secure the riding safety of the trains, advanced railway countries have limited the vertical acceleration of the bridge slab below critical values at specific frequency domains. Since these limitations of the vertical acceleration constitute the most important factors in securing the dynamic safety of the bridges, these countries have opted for a conservative approach. However, the Korean specifications limit only the size of the peak acceleration without considering the frequency domain, which impede significantly rational evaluation of the high-speed railway bridges in Korea. In addition, the evaluation of the acceleration without consideration of the frequency domain is the cause of disagreement between the dynamic analysis and measurement results. This study conducts field monitoring and dynamic analysis on high-speed railway bridges to gather the acceleration signals and compare them. Significant difference in the size of the vertical acceleration was observed between the measured and dynamic analysis accelerations when discarding the frequency domain as done in the current specifications. The comparison of the accelerations considering only low frequencies below 30 Hz showed that the dynamic analysis reflected accurately the measured vertical acceleration. 展开更多
关键词 HIGH-SPEED RAILWAY Bridge Vertical ACCELERATION Dynamic Response
下载PDF
A Study on the Wave Screening Effectiveness According to Trench Dimensions Using Ultrasonic Waves
13
作者 Hee Seok Kim won jong chin 《Engineering(科研)》 2014年第10期601-609,共9页
In this study numerical and experimental studies are conducted to examine the wave screening effectiveness of trenches. The numerical study relies on the finite element model of a sandbox with Lysmer-Kuhlemeyer absorb... In this study numerical and experimental studies are conducted to examine the wave screening effectiveness of trenches. The numerical study relies on the finite element model of a sandbox with Lysmer-Kuhlemeyer absorbing boundaries. This model is used to examine the screening ef-fectiveness of trench studied for different trench dimensions and distances from the source and receiver to the trench. The results of the numerical analysis are compared with the results of the ultrasonic experiment performed on an acrylic block drilled with a rectangular cut. The comparison shows that the screening effectiveness of the trench is nearly equal if the depth of trench is larger than 60% of the surface wave length. It is also shown that if the distance between the trench and the source is longer than twice the surface wave length, the thickness of the trench does not affect the screening effectiveness. 展开更多
关键词 WAVE SCREENING TRENCH Absorbing BOUNDARY ULTRASONIC WAVE
下载PDF
Load-Measuring Pot Bearing with Built-In Load Cell —Part I: Design and Performance
14
作者 Jeong-Rae Cho Young Jin Kim +3 位作者 jong-won Kwark Sung Yong Park won jong chin Byung-Suk Kim 《Engineering(科研)》 2013年第11期856-864,共9页
This paper presents the underlying principle and the results of various performance evaluations for a load-measuring pot bearing with built-in load cell. The pot bearing composed of a pot made of steel in which an ela... This paper presents the underlying principle and the results of various performance evaluations for a load-measuring pot bearing with built-in load cell. The pot bearing composed of a pot made of steel in which an elastomer disk is inserted is a bearing supporting larger loads than the elastomeric bearing and accommodating rotational movement. Owing to a Poisson’s ratio close to 0.5, elastomer withstands hydrostatic pressure when confined in a rigid body. Accounting for this principle, the vertical load applied on the pot bearing can be obtained by converting the pressure acting on the elastomer. Therefore, a load-measuring pot bearing is developed in this study by embedding a load cell exhibiting remarkable durability in the base plate of the bearing. The details for the insertion of the load cell in the base plate of the pot were improved through finite element analysis to secure sufficient measurement accuracy. The evaluation of the static performance of the pot bearing applying these improved details verified that the bearing exhibited sufficient accuracy for the intended measurement purpose. The dynamic performance evaluation results indicated that accurate measurement of the dynamic load was also achieved without time lag. 展开更多
关键词 BRIDGE BEARING POT BEARING Load-Measuring LOAD Cell
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部