A method for packing irregular particles with a prescribed volume fraction is proposed.Furthermore,the generated granular material adheres to the prescribed statistical distribution and satisfies the desired complex s...A method for packing irregular particles with a prescribed volume fraction is proposed.Furthermore,the generated granular material adheres to the prescribed statistical distribution and satisfies the desired complex spatial arrangement.First,the irregular geometries of the realistic particles were obtained from the original particle images.Second,the Minkowski sum was used to check the overlap between irregular particles and place an irregular particle in contact with other particles.Third,the optimised advance front method(OAFM)generated irregular particle packing with the prescribed statistical dis-tribution and volume fraction based on the Minkowski sum.Moreover,the signed distance function was introduced to pack the particles in accordance with the desired spatial arrangement.Finally,seven biaxial tests were performed using the UDEC software,which demonstrated the accuracy and potential usefulness of the proposed method.It can model granular material efficiently and reflect the meso-structural characteristics of complex granular materials.This method has a wide range of applications where discrete modelling of granular media is necessary.展开更多
Previous studies on pipe friction resistance are mainly concentrated in the soil layer,whereas the study on that in the rock stratum is limited.To estimate the pipe friction resistance in the rock stratum,the calculat...Previous studies on pipe friction resistance are mainly concentrated in the soil layer,whereas the study on that in the rock stratum is limited.To estimate the pipe friction resistance in the rock stratum,the calculation models of pipe friction resistance and their applica-tion conditions were compared first.Then the friction resistance calculation model for pipe jacking in the rock stratum was established and simplified.Lastly,the measured(FM)and the computed(FN)pipe friction resistance was compared to validate the simplified friction resistance calculation model.The following conclusions can be drawn:(1)The existing calculation methods of pipe friction resistance can be well verified in the soil layer but cannot be applied in the rock stratum.(2)Sediment,pipe–rock friction coefficient and mud buoyancy are the main factors affecting the pipe friction resistance in long-distance rock pipe jacking engineering.(3)The simplified calculation model established by Deng et al.can estimate the pipe friction resistance in different rock strata at different jacking stages with satisfac-tory outcomes.Further research on the pipe-rock friction coefficient in different rock strata with different pipe–rock contact conditions merits further investigation to better predict the pipe friction resistance in the rock stratum.The research results have certain practica-bility and can provide a reference for similar projects.展开更多
Mountain road tunnels are prone to water leakage and lining corrosion under the complex geological conditions and corrosive envi-ronments,which will reduce the strength of the lining structure until it loses its load-...Mountain road tunnels are prone to water leakage and lining corrosion under the complex geological conditions and corrosive envi-ronments,which will reduce the strength of the lining structure until it loses its load-bearing capacity;eventually,the definitive lining will need to be replaced.In this paper,a highway tunnel in a mountainous area in Southwest China is taken as an example.Field investi-gation found that the tunnel was seriously corroded by sulfate,the strength of the definitive lining decreased,and large-scale cracks and spalling appeared on the surface,so the operator decided to replace the definitive lining by the method of interval replacement.Based on the data obtained from drilling and coring,a numerical model of long-distance replacement of the definitive lining of the damaged tunnel is established.First,the back analysis of the calculation parameters is carried out,and the modified calculation results are com-pared with the field monitoring results for verification.Then,the deformation trend of the tunnel and the development of the plastic zone during the process of long-distance replacement of the definitive lining are studied.Finally,the construction scheme is optimized.Numer-ical analysis results show that the replacement of the definitive lining of the tunnel mainly leads to the settlement of the arch crown and the uplift of the inverted arch.The deformation of the tunnel shows two rapid growth stages and two stable stages during the replace-ment process;after replacement,the deformation of the arch crown and the inverted arch is divided into two buffer zones and one stable zone.In the progress of the replacement of the definitive lining,the plastic zone does not change.Regarding the reinforcement measures,with the increase in the grouting range,the grouting efficiency decreases,and the effect of the temporary steel arch on controlling the overall deformation is not obvious.The length of the replacement of the single section should be determined according to the geological conditions of the replacement section and the monitoring data during construction.The research results can provide a reference for sim-ilar projects for the replacement of the definitive lining.展开更多
基金The authors would like to acknowledge the financial support provided by the National Key R&D Program of China(Grant No.2018YFC1504802)the National Natural Science Foundation of China(Grant Nos.41972266,12102230).
文摘A method for packing irregular particles with a prescribed volume fraction is proposed.Furthermore,the generated granular material adheres to the prescribed statistical distribution and satisfies the desired complex spatial arrangement.First,the irregular geometries of the realistic particles were obtained from the original particle images.Second,the Minkowski sum was used to check the overlap between irregular particles and place an irregular particle in contact with other particles.Third,the optimised advance front method(OAFM)generated irregular particle packing with the prescribed statistical dis-tribution and volume fraction based on the Minkowski sum.Moreover,the signed distance function was introduced to pack the particles in accordance with the desired spatial arrangement.Finally,seven biaxial tests were performed using the UDEC software,which demonstrated the accuracy and potential usefulness of the proposed method.It can model granular material efficiently and reflect the meso-structural characteristics of complex granular materials.This method has a wide range of applications where discrete modelling of granular media is necessary.
基金supported by the National Natural Science Foundation of China(Grant No.12102230)the National Key Research and Development Program of China(Grant No.2018YFC1504802)+1 种基金the Natural Science Foundation Project of Chongqing(Grant No.cstc2018jscx-mszdX0071)the China Postdoctoral Science Foundation(Grant No.2022M711862).
文摘Previous studies on pipe friction resistance are mainly concentrated in the soil layer,whereas the study on that in the rock stratum is limited.To estimate the pipe friction resistance in the rock stratum,the calculation models of pipe friction resistance and their applica-tion conditions were compared first.Then the friction resistance calculation model for pipe jacking in the rock stratum was established and simplified.Lastly,the measured(FM)and the computed(FN)pipe friction resistance was compared to validate the simplified friction resistance calculation model.The following conclusions can be drawn:(1)The existing calculation methods of pipe friction resistance can be well verified in the soil layer but cannot be applied in the rock stratum.(2)Sediment,pipe–rock friction coefficient and mud buoyancy are the main factors affecting the pipe friction resistance in long-distance rock pipe jacking engineering.(3)The simplified calculation model established by Deng et al.can estimate the pipe friction resistance in different rock strata at different jacking stages with satisfac-tory outcomes.Further research on the pipe-rock friction coefficient in different rock strata with different pipe–rock contact conditions merits further investigation to better predict the pipe friction resistance in the rock stratum.The research results have certain practica-bility and can provide a reference for similar projects.
基金supported by the National Natural Science Foundation of China,China(Grant Nos.41972266,52104076,and 12102230)the China Postdoctoral Science Foundation,China(Grant No.2022M711862).
文摘Mountain road tunnels are prone to water leakage and lining corrosion under the complex geological conditions and corrosive envi-ronments,which will reduce the strength of the lining structure until it loses its load-bearing capacity;eventually,the definitive lining will need to be replaced.In this paper,a highway tunnel in a mountainous area in Southwest China is taken as an example.Field investi-gation found that the tunnel was seriously corroded by sulfate,the strength of the definitive lining decreased,and large-scale cracks and spalling appeared on the surface,so the operator decided to replace the definitive lining by the method of interval replacement.Based on the data obtained from drilling and coring,a numerical model of long-distance replacement of the definitive lining of the damaged tunnel is established.First,the back analysis of the calculation parameters is carried out,and the modified calculation results are com-pared with the field monitoring results for verification.Then,the deformation trend of the tunnel and the development of the plastic zone during the process of long-distance replacement of the definitive lining are studied.Finally,the construction scheme is optimized.Numer-ical analysis results show that the replacement of the definitive lining of the tunnel mainly leads to the settlement of the arch crown and the uplift of the inverted arch.The deformation of the tunnel shows two rapid growth stages and two stable stages during the replace-ment process;after replacement,the deformation of the arch crown and the inverted arch is divided into two buffer zones and one stable zone.In the progress of the replacement of the definitive lining,the plastic zone does not change.Regarding the reinforcement measures,with the increase in the grouting range,the grouting efficiency decreases,and the effect of the temporary steel arch on controlling the overall deformation is not obvious.The length of the replacement of the single section should be determined according to the geological conditions of the replacement section and the monitoring data during construction.The research results can provide a reference for sim-ilar projects for the replacement of the definitive lining.