Enhancing Autonomy Capability in Regional Power Grids:A Strategic Planning Approach with Multiple Autonomous Evaluation Indexes
1
作者 Jie Ma Tong Zhao +8 位作者 Yuanzhao Hao Wenwen Qin Haozheng Yu Mingxuan Du Yuanhong Liu Liang Zhang Shixia Mu Cuiping Li Junhui Li 《Energy Engineering》 EI 2024年第9期2449-2477,共29页
After the integration of large-scale DistributedGeneration(DG)into the distribution network,the randomness and volatility of its output result in a reduction of spatiotemporal alignment between power generation and de... After the integration of large-scale DistributedGeneration(DG)into the distribution network,the randomness and volatility of its output result in a reduction of spatiotemporal alignment between power generation and demand in the distribution network,exacerbating the phenomenon of wind and solar power wastage.As a novel power system model,the fundamental concept of Regional Autonomous Power Grids(RAPGs)is to achieve localized management and energy autonomy,thereby facilitating the effective consumption of DGs.Therefore,this paper proposes a distributed resource planning strategy that enhances the autonomy capabilities of regional power grids by considering multiple evaluation indexes for autonomy.First,a regional Energy Storage(ES)configuration strategy is proposed.This strategy can select a suitable reference value for the upper limit of ES configuration based on the regional load andDGoutput to maximize the elimination of source load deviations in the region as the upper limit constraint of ES capacity.Then,a control strategy for regional ES is proposed,the charging and discharging reference line of ES is set,and multiple autonomy and economic indexes are used as objective functions to select different proportions of ES to control the distributed resources of the regional power grid and establish evaluation indexes of the internal regional generation and load power ratio,the proportion of power supply matching hours,new energy consumption rate and tie line power imbalance outside the region to evaluate changes in the regional autonomy capabilities.The final simulation results showthat in the real regional grid example,the planning method in the planning year in the region of the overall power supply matching hour ratio and new energy consumption rate increased by 3.9%and 4.8%on average,and the power imbalance of the tie line decreased by 7.8%on average.The proposed planning approach enables the maximization of regional autonomy while effectively smoothing the fluctuation of power exchange between the regional grid and the higher-level grid.This presents a rational and effective planning solution for the regional grid,facilitating the coordinated development between the region and the distribution network. 展开更多
关键词 regional autonomous power grid distributed generation distributed energy storage regional planning strategy evaluation index
下载PDF
Review of trans-Mediterranean power grid interconnection:a regional roadmap towards energy sector decarbonization 被引量:1
2
作者 Kaifeng Yu Paul van Son 《Global Energy Interconnection》 EI CAS CSCD 2023年第1期115-126,共12页
Climate change is becoming an important issue in all fields of infrastructure development.Electricity plays a core role in the decarbonized energy system’s path to a regional zero-emission pattern.A well-built trans-... Climate change is becoming an important issue in all fields of infrastructure development.Electricity plays a core role in the decarbonized energy system’s path to a regional zero-emission pattern.A well-built trans-Mediterranean backbone grid can hedge the profound evolution of regional power generation,transmission,and consumption.To date,only Turkey and the Maghreb countries(i.e.,Morocco,Algeria,and Tunisia)are connected with the Continental European Synchronous Area.Other south-and east-shore countries have insufficient interconnection infrastructures and synchronization difficulties that have proven to be major hurdles to the implementation of large-scale solar and wind projects and achievement of climate goals.This study analyzes the current trans-boundary grid interconnections and power and carbon emission portfolios in the Mediterranean region.To align with the recently launched new climate target‘Fit for 55’program and the accelerated large-scale renewables target,a holistic review of projected trans-Mediterranean grids and their market,technical,and financial obstacles of implementation was conducted.For south-and east-shore countries,major legal and regulatory barriers encompassing non-liberalized market structure,regulation gaps of taxation and transmission tariffs,and the private sector’s access rights need to be removed.Enhancement of domestic grids,substations,and harmonized grid codes and frequency,voltage,and communication technology standards among all trans-Mediterranean countries are physical prerequisites for implementing the Trans-Mediterranean Electricity Market.In addition,the mobilization of capital instruments along with private and international investments is indispensable for the realization of supranational transmission projects.As the final section of the decarbonization roadmap,the development of electric appliances,equipment,and vehicles with higher efficiency is inevitable in the decarbonized building,transportation,and industry sectors. 展开更多
关键词 Mediterranean grid interconnection regional roadmap power system Decarbonization Climate change
下载PDF
Study on Comprehensive Efficiency Evaluation of Rural Power Grid under Rural Revitalization Strategy Considering Regional Differences
3
作者 Huiru Zhao Manyu Yao +3 位作者 Zhenqi Bai Yue Zhang Zhihua Ding Zhenda Hu 《Energy Engineering》 EI 2023年第10期2211-2231,共21页
As an essential infrastructure,the rural power grid is vital in promoting agricultural and rural carbon sequestration and improving rural energy electrification.It is necessary to carry out in-depth research on its co... As an essential infrastructure,the rural power grid is vital in promoting agricultural and rural carbon sequestration and improving rural energy electrification.It is necessary to carry out in-depth research on its comprehensive efficiency.Based on the requirements of“double carbon”and rural revitalization strategy for the rural Power Grid,this paper focuses on the modernization and low-carbon transformation of the rural Power Grid.It constructs an input-output index system for the investment efficiency of the rural Power Grid in China under the new situation.It uses the primary data of the rural Power Grid of 30 prefecture-level cities in China from 2019 to 2021 to evaluate the investment efficiency of the rural Power Grid in China through a three-stage DEA model.The empirical results show that:considering the regional differences,the comprehensive efficiency of the rural Power Grid in backward areas is significantly improved;that is,the three-stage DEA method can more objectively evaluate the comprehensive efficiency of the rural Power Grid.In the context of the continued promotion of the rural revitalization strategy,to improve the comprehensive efficiency of the rural Power Grid,it is necessary to improve the technical level of the rural Power Grid further and appropriately expand the scale of investment in the rural Power Grid. 展开更多
关键词 regional difference rural revitalization rural power grid three-stage DEA efficiency of investment
下载PDF
Research on Safety and Stability of Regional Power Grids to the Year 2020
4
作者 Zhou Qinyong Zhao Liang +1 位作者 Guo Qiang Jin Wen 《Electricity》 2005年第3期26-31,共6页
The safety and stability study on Northeast, North, East, Northwest and Central China power grids had been carried out, which provided technical supports to planning design of regional power grids. By analyzing safety... The safety and stability study on Northeast, North, East, Northwest and Central China power grids had been carried out, which provided technical supports to planning design of regional power grids. By analyzing safety and stability under severe faults in regional power grids, revealed weaknesses on power grid configurations and measures for preventing from loss of stability were presented. In comparison of various schemes of power system safety and stability among parts of power grids, more than two recommended schemes can be chosen as reference in planning design for regional power grids. Considering the safety and stability control measures necessary for each power grids, it is believed the trunk networks of all power grids can fulfill the third criteria of Guideline for Power System Safety and Stability, while the weakness and predominated hydropower may deteriorate safety and stability of power grids. The power grid shall be regulated in line with the variation of boundary conditions. 展开更多
关键词 regional power grid safe and stable power grid planning power system
下载PDF
电网调度AVC系统自动优化协调控制方法
5
作者 赵峰 窦国贤 +1 位作者 周伟 李小威 《电子设计工程》 2024年第22期91-95,共5页
由于电网调度过程中电压变化量较大,电网调度AVC系统难以精准控制电压变化,所以提出电网调度AVC系统自动优化协调控制方法。确定总-中-地调三个层次协同的电力系统架构,搭建协调调度控制模型,确定母线、机组、无功裕度、功率方面的协调... 由于电网调度过程中电压变化量较大,电网调度AVC系统难以精准控制电压变化,所以提出电网调度AVC系统自动优化协调控制方法。确定总-中-地调三个层次协同的电力系统架构,搭建协调调度控制模型,确定母线、机组、无功裕度、功率方面的协调约束规则。在协调约束规则下确定电网AVC系统分层分区结构,计算电压无功控制空间中任意两个待分区节点之间的距离,划分电压无功控制区域,结合灵敏度确定优化协调控制矩阵,实现AVC系统自动优化协调控制。实验结果表明,该方法控制下的电压与实际数值之间误差小,能够实现电压平衡和降低网损的目标。 展开更多
关键词 电网调度 avc系统 自动优化 协调控制
下载PDF
Implementation of Dynamic Line Rating in a Sub-Transmission System for Wind Power Integration
6
作者 Saifal Talpur Carl Johan Wallnerstrom +1 位作者 Patrik Hilber Christer Flood 《Smart Grid and Renewable Energy》 2015年第8期233-249,共17页
Based on conventional static line rating method, the actual current carrying capability of overhead conductors cannot be judged. Due to continuous increment in electricity demand and the difficulties associated with n... Based on conventional static line rating method, the actual current carrying capability of overhead conductors cannot be judged. Due to continuous increment in electricity demand and the difficulties associated with new line constructions, the overhead lines are therefore required to be rated based on a method that should establish their real-time capability in terms of electricity transmission. The method used to determine the real-time ampacity of overhead conductors not only can enhance their transmission capacity but can also help in allowing excessive renewable generation in the electricity network. In this research work, the issues related to analyzing an impact of wind power on periodical loading of overhead line as well as finding its static and dynamic ampacities with line current are investigated in detail. Moreover, the investigation related to finding a suitable location for the construction of a 60 MW wind farm is taken on board. Thereafter, the wind park is integrated with a regional grid, owned by Fortum Distribution AB. In addition to that, the electricity generated from the wind park is also calculated in this project. Later on, the work is devoted to finding the static and dynamic line ratings for “VL3” overhead conductor by using IEEE-738-2006 standard. Furthermore, the project also deals with finding the line current and making its comparison with maximum capacity of overhead conductor (VL3) for loading it in such a way that no any violation of safe ground clearance requirements is observed at all. Besides, the line current, knowing the conductor temperature when it transmits the required electricity in the presence of wind power generation is also an important factor to be taken into consideration. Therefore, based on real-time ambient conditions with actual line loading and with the help of IEEE-738-2006 standard, the conductor temperature is also calculated in this project. At the end, an economic analysis is performed to evaluate the financial advantages related to applying the dynamic line ratings approach in place of traditional static line ratings technique across an overhead conductor (VL3) and to know how much beneficial it is to temporarily postpone the rebuilding and/or construction of a new transmission line. Furthermore, an economic analysis related to wind power system is taken into consideration as well to get familiar with the costs related to building and connecting a 60 MW wind farm with the regional grid. 展开更多
关键词 Overhead Conductor STATIC and DYNAMIC Ampacities Real-Time Weather Conditions STATIC and DYNAMIC LINE RATING Techniques WIND power Integration regional grid LINE Current. Conductor Temperature WIND power ECONOMICS DYNAMIC LINE RATING ECONOMICS
下载PDF
Energy Conservation and Emissions Reduction: Experiences from Three Provincial Power Companies and One Regional Power Grid Company
7
作者 By Qing Lei, Xu Lizheng and Liu Ping Journalists of China Power Enterprise Management Wang Ningling 《Electricity》 2008年第2期23-32,共10页
Power industry is one of the key fields for energy conservation and emissions reduction (ECER) in China. In order to achieve the nation's overall energy consumption target and pollutant emission target set by the ... Power industry is one of the key fields for energy conservation and emissions reduction (ECER) in China. In order to achieve the nation's overall energy consumption target and pollutant emission target set by the 11th Five-Year Plan, to build the resource-conservation and environment-friendly society during the 11th Five-Year Plan period (2006-2010), it is crucial to implement the policy of "Large (units) In and Small (units) Out (LISO)" (i.e., replacing small units with large ones) and accelerate the retirement of small thermal units. According to the statistics, the power industry has made a significant progress in SO2 emission reduction during the first half of 2007. Specifically, with 18.3% growth in power generation, the SO2 emission was reduced by 5.2% compared with the same period in 2006. By the end of July 2007, the retired small units have totaled 6950 MW, 85% of which belongs to the five major power generation groups such as Guodian and Huadian. In this article, the achievements and remaining issues in Henan, Jiangsu, Sichuan Power Companies and East China Grid Company were presented and discussed thoroughly. 展开更多
关键词 Experiences from Three Provincial power Companies and One regional power grid Company
下载PDF
Regulating cost for renewable energy integration in power grids 被引量:3
8
作者 Dong Zhang Peiyu You +3 位作者 Fan Liu Yuhong Zhang Yantao Zhang Chao Feng 《Global Energy Interconnection》 2018年第5期544-551,共8页
To address the issue of climate change caused by the use of polluting, non-renewable energy sources, the use of renewable energy has gained momentum worldwide. Consequently, the increased integration of renewable ener... To address the issue of climate change caused by the use of polluting, non-renewable energy sources, the use of renewable energy has gained momentum worldwide. Consequently, the increased integration of renewable energy sources into power grids has necessitated the inclusion of flexible capacities in the power systems to solve problems of intermittent and fluctuating characteristics associated with renewable generation outputs. In this work, we study the regulating cost of a power system with high renewable penetration using an improved time-series system production simulation analysis method. The operational cost of the system is considered as the objective function. Three different methods to increase regulating capacities, including using interconnection lines, building additional flexible power capacities, and retrofitting existing thermal power plants, are adopted and simulated to compare the costs of accommodating renewable energy in the system in these cases. Our results indicate that increasing the flexibility of thermal power plants and developing crossregional connection lines are cost-effective methods of increasing renewable energy consumption. 展开更多
关键词 RENEWABLE energy power grid REGULATING ABILITY Cross-regional connecting LINES
下载PDF
Problems of Planning for Power Industry in China
9
作者 Wu Jingru Chen Jianbo Chu Xue(Translated) 《Electricity》 2006年第1期10-14,共5页
On the basis of summing up the development of electric power industry in the 10th Five-Year Plan period, the idea of electric power development planning from 2006 to 2020 is presented. The authors analyzed ten main pr... On the basis of summing up the development of electric power industry in the 10th Five-Year Plan period, the idea of electric power development planning from 2006 to 2020 is presented. The authors analyzed ten main problems that existed in electric development during the 10th Five-Year Plan period, forecasted the electricity generation from 2006 to 2020, put forward the development strategy of power industry, discussed the component and development program of hydropower, thermal power, nuclear power, natural gas power and renewable power, outlined the present situations of six regional power grids, power transmission from western to eastern regions, UHV AC/DC power transmission and nationwide power grid interconnections, and finally gave out seven suggestions about electric power development in the future. 展开更多
关键词 electric power industry development planning installed capacity electricity generation regional power grid
下载PDF
基于RMT-CNN的电网短路故障定位研究
10
作者 刘义艳 郝婷楠 张伟 《北京理工大学学报》 EI CAS CSCD 北大核心 2024年第4期403-412,共10页
随着我国智能电网的快速发展,电网监测数据呈现多元化、高速化、海量化的趋势.为了充分挖掘电力大数据的潜在价值,实现电网内异常区域的自动识别与定位,本文研究了基于随机矩阵理论(random matrix theory,RMT)和卷积神经网络(convolutio... 随着我国智能电网的快速发展,电网监测数据呈现多元化、高速化、海量化的趋势.为了充分挖掘电力大数据的潜在价值,实现电网内异常区域的自动识别与定位,本文研究了基于随机矩阵理论(random matrix theory,RMT)和卷积神经网络(convolutional neural networks,CNN)的电网异常事件定位方法.首先根据电网内部联系将电网划分为若干子系统,分区构建监测矩阵;然后采用RMT作为数据挖掘的特征提取方法,提取分区矩阵特征向量作为输入,根据电网监测数据和异常识别需求的特点搭建CNN模型;最后基于分区矩阵特征向量构建数据集,训练获得有效的异常事件自动定位CNN模型.以IEEE39节点电网模型三相短路故障为例,分析表明通过RMT提取特征向量的预处理方法能有效降低数据维度,提高CNN模型的故障定位准确率,分区RMT-CNN模型能有效定位电网内异常事件的发生地点,定位精度可达97.96%,精确率可达98.65%. 展开更多
关键词 电网 随机矩阵理论 卷积神经网络 异常区域 故障定位
下载PDF
乡村振兴战略下农网综合效益评价模型研究
11
作者 赵会茹 白振奇 《华北电力大学学报(社会科学版)》 2024年第1期55-69,共15页
农村地区之间存在着显著的地区差异,为了指导农村电网投资,提出一种基于组合赋权和多属性边界逼近区域比较法(multi-attributive border approximation area comparison,MABAC)的差异化农网综合效益评价模型。首先,综合考虑农村地区差... 农村地区之间存在着显著的地区差异,为了指导农村电网投资,提出一种基于组合赋权和多属性边界逼近区域比较法(multi-attributive border approximation area comparison,MABAC)的差异化农网综合效益评价模型。首先,综合考虑农村地区差异及乡村振兴战略对农网发展的要求,从农网投资经济效益、供电能力、基础设施情况、地区发展带动、生产生活质量、清洁低碳发展等6个方面构建农网综合效益评价指标体系;其次,基于最小化主客观权重异质性原则构建基于图模型—熵权法的组合赋权模型,并引入MABAC方法用于解决农网综合效益评价问题;最后,通过算例分析验证了所提出模型的有效性。 展开更多
关键词 乡村振兴战略 农村电网 地区差异 组合赋权 MABAC 综合效益
下载PDF
基于改进重要度的约简算法在区域配电网故障诊断中的应用
12
作者 杜瑞娟 《南阳理工学院学报》 2024年第4期64-68,共5页
配电网发生故障后,保护装置拒动或误动使得大量不完备信息涌入调度中心,这些缺失、冗余、错误的信息将可能导致诊断结果的不准确甚至严重错误。在原有经典依赖度算法基础上,提出一种基于改进的重要度约简算法,对信息不完备、冗余、错误... 配电网发生故障后,保护装置拒动或误动使得大量不完备信息涌入调度中心,这些缺失、冗余、错误的信息将可能导致诊断结果的不准确甚至严重错误。在原有经典依赖度算法基础上,提出一种基于改进的重要度约简算法,对信息不完备、冗余、错误的决策表进行约简。约简后的决策表决策属性与原始决策表一致,而条件属性较原始决策表减少。最后结合区域配电网算例,对配电网发生故障后的不一致决策表进行重要度的计算,采用基于改进重要度的约简算法对原始决策表进行约简,得到去除冗余属性后的决策表,解决不一致决策表因信息缺失造成决策属性误判的问题,验证算法正确性。 展开更多
关键词 重要度 属性约简 区域电网 故障诊断
下载PDF
面向燃气机组调峰的天然气管网动态安全域 被引量:2
13
作者 杜蕙 林涛 +3 位作者 张效宁 李君 李轻言 付希越 《中国电机工程学报》 EI CSCD 北大核心 2024年第5期1881-1893,I0018,共14页
燃气机组调峰的灵活性有助于提升可再生能源消纳水平,但所造成的管道压力剧烈波动却为天然气管网引入新的安全风险。该文提出一种面向燃气机组调峰的天然气管网动态安全域,以表征满足动态管流安全的燃气机组有功调整量的集合。首先,分... 燃气机组调峰的灵活性有助于提升可再生能源消纳水平,但所造成的管道压力剧烈波动却为天然气管网引入新的安全风险。该文提出一种面向燃气机组调峰的天然气管网动态安全域,以表征满足动态管流安全的燃气机组有功调整量的集合。首先,分析以时域连续的气负荷质量流率作为注入空间的天然气管网动态安全域难以实用化的原因。为此,提出将燃气机组进气口质量流率转化为有功调整量的函数,定义以初始运行点为基准、以各燃气机组有功调整量为注入空间的天然气管网动态安全域。为兼顾计算精度和效率,基于时空正交配置法对管网连续变量进行近似离散,建立安全域边界搜索优化模型。并进一步揭示天然气管网稳态安全域可通过松弛该优化模型中部分约束条件求解得到,为动态安全域的一种退化形式。算例结果表明,所提方法克服天然气管网稳态安全域对于日内安全分析过于乐观的局限性,有助于增强电力-天然气耦合系统的协同态势感知能力。 展开更多
关键词 新型电力系统 天然气管网 智能发电 燃气机组调峰 安全域 动态管流
原文传递
计及梯级电站的省地一体化AVC系统研究及实现方案 被引量:14
14
作者 唐茂林 庞晓艳 +6 位作者 李旻 刘柏私 尹晓澜 张蓓 李建 郭庆来 孙宏斌 《电力自动化设备》 EI CSCD 北大核心 2009年第6期119-123,共5页
在省调自动电压控制(AVC)主站中,将梯级电站集控中心作为一电厂侧AVC子站,后者根据前者的高压母线电压目标值自动调整各电站、各机组无功出力,前者则将各梯级电站分别作为优化协调单元。同时,提出了省调、地调、直控变电站以及电厂侧AV... 在省调自动电压控制(AVC)主站中,将梯级电站集控中心作为一电厂侧AVC子站,后者根据前者的高压母线电压目标值自动调整各电站、各机组无功出力,前者则将各梯级电站分别作为优化协调单元。同时,提出了省调、地调、直控变电站以及电厂侧AVC系统的功能职责及其之间的相互协调方案以实现省地一体化AVC系统的闭环运行。利用所提出的计及梯级电站的省地一体化AVC系统实现方案离线对四川电网多种运行方式进行了仿真计算,结果表明,所提方案可降低网络损耗,具有工程适用性。 展开更多
关键词 自动电压控制系统 梯级电站 无功出力 网络损耗 电网
下载PDF
基于实时仿真系统的地区电网AVC系统闭环检测方法 被引量:9
15
作者 唐永红 徐琳 +1 位作者 范宏 丁会凯 《电网技术》 EI CSCD 北大核心 2013年第9期2515-2520,共6页
提出一种基于实时仿真系统的地区电网自动电压控制(automatic voltage control,AVC)系统闭环检测方法。基于该方法建立了地区电网AVC系统检测平台,该平台由实时仿真系统、中间数据转换接口装置、地区电网AVC系统3部分组成。在实时仿真... 提出一种基于实时仿真系统的地区电网自动电压控制(automatic voltage control,AVC)系统闭环检测方法。基于该方法建立了地区电网AVC系统检测平台,该平台由实时仿真系统、中间数据转换接口装置、地区电网AVC系统3部分组成。在实时仿真系统中构建的系统模型包含系统平台模型和中央控制系统模型,通过中间数据转换接口装置将实时仿真系统的模拟量和开关量转换后传给地区电网AVC系统,由AVC系统计算得到控制策略后再通过中间数据转换装置回传到实时仿真系统。该闭环检测平台解决了地区电网AVC系统在现场测试的难题,实现了地区电网AVC系统在试验室检测的目标。 展开更多
关键词 电力系统 实时仿真 地区电网avc系统 检测平台 检测方法
原文传递
面向智能电网调度技术支持系统的AVC模块设计 被引量:6
16
作者 郭庆来 孙宏斌 +3 位作者 王彬 汤磊 张伯明 吴文传 《电力科学与技术学报》 CAS 2010年第4期2-6,共5页
智能电网调度技术支持系统(D 5000系统)是国家电网公司为实现坚强智能电网目标而实施的重要基础平台.重点阐述面向D 5000平台的自动电压控制(AVC)模块设计思路。采用基于软分区的三级电压控制模式,涵盖监视、优化、控制等主要功能,可实... 智能电网调度技术支持系统(D 5000系统)是国家电网公司为实现坚强智能电网目标而实施的重要基础平台.重点阐述面向D 5000平台的自动电压控制(AVC)模块设计思路。采用基于软分区的三级电压控制模式,涵盖监视、优化、控制等主要功能,可实现对电厂、变电站以及下级控制中心的协调控制.并介绍AVC模块的数据流和嵌入式技术实现方法,给出AVC模块与D 5000平台其他功能模块之间的数据交互内容,完成了AVC模块在D 5000系统上的实际开发. 展开更多
关键词 智能电网 自动电压控制 电网调度
下载PDF
地、县两级电网AVC系统分层联合协调控制 被引量:21
17
作者 苏家祥 廖亨利 +1 位作者 袁文谦 陈景晖 《继电器》 CSCD 北大核心 2008年第10期36-39,共4页
我国地区电网和县级电网的运行和控制分别由地区调度中心和县网调度中心分别管理,但事实上,从供电和电压无功控制的角度来看,两级电网却是垂直紧密耦合的。当两级电网分别安装有AVC系统后,有必要考虑两级AVC系统的联合优化控制。该文率... 我国地区电网和县级电网的运行和控制分别由地区调度中心和县网调度中心分别管理,但事实上,从供电和电压无功控制的角度来看,两级电网却是垂直紧密耦合的。当两级电网分别安装有AVC系统后,有必要考虑两级AVC系统的联合优化控制。该文率先提出了适合国内电网调度运行管理模式的地、县网AVC系统联合控制的分层协调控制方案,建立了地网AVC系统优化模型,提出了联合协调控制的技术原理、技术方案,分别从功率因数调节和电压分层调压两个方面阐述了控制流程和控制策略。进一步优化了无功潮流,降低了网损,减少了由于各自独立运行时调压引起的设备调节振荡,缓解了地区电网功率因数调节的压力,减少了地区电网无功补偿设备的投切次数。 展开更多
关键词 自动电压控制 分层联合协调控制 地区电网 功率因数控制 调度自动化
下载PDF
改进新息图法在地区电网AVC系统中的应用 被引量:3
18
作者 林瑞星 杨洪耕 惠锦 《电力系统自动化》 EI CSCD 北大核心 2010年第7期107-111,共5页
新息图法对于坏数据、拓扑变化的辨识有着显著效果。文中针对地区电网的辐射特性,提出了新息图法的分层辨识,建立了厂站层和联络线层新息图模型。当连支出现坏数据时,采用伪量测对其进行修正,避免了传统方法更换连支后需重新生成树的不... 新息图法对于坏数据、拓扑变化的辨识有着显著效果。文中针对地区电网的辐射特性,提出了新息图法的分层辨识,建立了厂站层和联络线层新息图模型。当连支出现坏数据时,采用伪量测对其进行修正,避免了传统方法更换连支后需重新生成树的不足;支路预估值的准确程度将影响新息值的准确性,对此利用自动电压控制(AVC)系统潮流验证模块k时刻的在线潮流计算值与测量值的差值ΔP,按系数α对k+1时刻支路预估值进行趋近补偿,补偿后的潮流推算曲线更接近真值,提高了拓扑变化辨识的准确性。将以上改进的新息图法应用于四川省多个地区电网AVC系统,运行效果良好,能准确辨识坏数据和拓扑变化。 展开更多
关键词 自动电压控制(avc) 地区电网 分层辨识 坏数据 拓扑变化 新息图法
下载PDF
地区AVC现状及智能AVC建设的若干思考 被引量:12
19
作者 杨洪耕 李智 《电力科学与技术学报》 CAS 2011年第1期77-81,共5页
地区自动电压控制(AVC)是地区电网的主要电压控制手段.分析地区AVC的现状、所采用的基本结构和软硬件环境,指出计算机加信息网络是AVC的基本构架,列举目前地区AVC存在的一些问题,并探讨解决办法;根据智能电网建设目标,结合地区AVC需求,... 地区自动电压控制(AVC)是地区电网的主要电压控制手段.分析地区AVC的现状、所采用的基本结构和软硬件环境,指出计算机加信息网络是AVC的基本构架,列举目前地区AVC存在的一些问题,并探讨解决办法;根据智能电网建设目标,结合地区AVC需求,提出若干思考,如自律分散控制、自适应控制与辩识、数据流问题、智能检索与智能告警;认为智能AVC的核心是围绕自动化、信息化和互动化提升地区AVC的安全、经济运行水平. 展开更多
关键词 电压无功控制 avc 自律分散控制 智能电网 智能告警
下载PDF
风电富集地区电网动态等值建模
20
作者 杨文佳 胡永浩 +2 位作者 朱林 武志刚 易杨 《南方电网技术》 CSCD 北大核心 2024年第6期69-78,共10页
为了满足大规模风电并网下对地区电网进行详细仿真的需求,提出了一种适用于风电并网的地区电网等值方法。与聚焦于主网的传统动态等值不同,风电富集地区电网等值不仅要考察风电在地区电网中密集接入的特点,圈定各个风电场站影响范围,而... 为了满足大规模风电并网下对地区电网进行详细仿真的需求,提出了一种适用于风电并网的地区电网等值方法。与聚焦于主网的传统动态等值不同,风电富集地区电网等值不仅要考察风电在地区电网中密集接入的特点,圈定各个风电场站影响范围,而且还要在边界节点上综合考虑外网的源、荷特性约束。所提方法可在保持稳态、暂态特性一致的前提下对外网进行大规模化简,实现地区电网的等值建模。首先,突破在风电场站接入点仅以短路比等电气强度指标来等效电网的传统方案,提出以节点残压来界定待研究区域与待等值外部区域;其次,考虑地区电网的拓扑约束对地区电网进行进一步化简;再次,考虑在边界节点上以等值同步发电机与复合负荷的组合形式构建外部系统的等值模型;最后,利用所提方法对实际风电富集地区电网进行了验证。仿真结果表明了所提等值方法的有效性。 展开更多
关键词 风电资源 动态等值 地区电网 残压 拓扑约束