The high-speed EMUs for Jakarta-Bandung high-speed railway(HSR)represent an important image and symbol of the Jakarta-Bandung HSR Project.By relying on the technical platform of the model CR400 EMU,the EMU is upgraded...The high-speed EMUs for Jakarta-Bandung high-speed railway(HSR)represent an important image and symbol of the Jakarta-Bandung HSR Project.By relying on the technical platform of the model CR400 EMU,the EMU is upgraded for the customized design in terms of adaptability to geographical environment and track conditions,integration of Indonesian cultural characteristics,etc.In the course of development,in order to accurately grasp the boundary conditions and solve matching adaptation problems,studies are conducted on the exploration of design boundary and the related special technology.With the systematic analysis and design experience summary of the high-speed EMUs for Jakarta-Bandung HSR,the paper aims to provide reference for the O&M of high-speed EMUs for Jakarta-Bandung HSR and the other similar overseas HSR projects.展开更多
On September 7,the Jakarta-Bandung High-Speed Railway(Jakarta-Bandung HSR),jointly built by China and Indonesia,opened,cutting the travel time between the two Indonesian cities from 3.5 hours to 40 minutes.Commercial ...On September 7,the Jakarta-Bandung High-Speed Railway(Jakarta-Bandung HSR),jointly built by China and Indonesia,opened,cutting the travel time between the two Indonesian cities from 3.5 hours to 40 minutes.Commercial operation will start at the beginning of October.展开更多
Purpose-This study aims to ensure the operation safety of high speed trains,it is necessary to carry out nondestructive monitoring of the tensile damage of the gearbox housing material in rail time,yet the traditional...Purpose-This study aims to ensure the operation safety of high speed trains,it is necessary to carry out nondestructive monitoring of the tensile damage of the gearbox housing material in rail time,yet the traditional tests of mechanical property can hardly meet this requirement.Design/methodology/approach-In this study the acoustic emission(AE)technology is applied in the tensile tests of the gearbox housing material of an high-speed rail(HSR)train,during which the acoustic signatures are acquired for parameter analysis.Afterward,the support vector machine(SVM)classifier is introduced to identify and classify the characteristic parameters extracted,on which basis the SVM is improved and the weighted support vector machine(WSVM)method is applied to effectively reduce the misidentification of the SVM classifier.Through the study of the law of relations between the characteristic values and the tensile life,a degradation model of the gearbox housing material amid tensile is built.Findings-The results show that the growth rate of the logarithmic hit count of AE signals and that of logarithmic amplitude can well characterize the stage of the material tensile process,and the WSVM method can improve the classification accuracy of the imbalanced data to above 94%.The degradation model built can identify the damage occurred to the HSR gearbox housing material amid the tensile process and predict the service life remains.Originality/value-The results of this study provide new concepts for the life prediction of tensile samples,and more further tests should be conducted to verify the conclusion of this research.展开更多
Up till now,no systematic studies on railway route selection in urban areas,HSR route selection in particular,have been taken in China.Based on the Shenzhen Railway Terminal Project and the Shenzhen-Shanwei Railway Pr...Up till now,no systematic studies on railway route selection in urban areas,HSR route selection in particular,have been taken in China.Based on the Shenzhen Railway Terminal Project and the Shenzhen-Shanwei Railway Project,research on HSR route selection in complicated urban areas has been conducted.An optimal route selection plan is determined after studying the local geological and environmental conditions and the complexity of tunnel construction.The research concludes that there are four major concerns in HSR route selection:the match between the new route and the urban planning,the potential economic return for the massive investment,the likely impacts of land expropriation on social stability,and the best synthesis of multiple controlling factors to meet the HSR standard.Moreover,six principles should be followed in railway route selection in complicated urban areas:the new route should be in alignment with the railway deployment;the route should align with the existing passage as much as possible;extensive analysis and in-depth demonstrations should be done to find the most appropriate combination of open and hidden excavation in tunnel construction;geological conditions and tunnel construction complexities are among the priorities;environmental sensitive sites and environmental vibration noise should be avoided as much as possible;special attention should be paid to the relocation of the power supply,television and communication facilities and the rearrangement of tubes and wires.展开更多
Changqing Yellow River Super-long Bridge of Zhengzhou-Ji'nan HSR is a partial cable-stayed bridge with concrete main girder and a unit length of 1,080 m.Studies are carried out on the key technologies of bridge de...Changqing Yellow River Super-long Bridge of Zhengzhou-Ji'nan HSR is a partial cable-stayed bridge with concrete main girder and a unit length of 1,080 m.Studies are carried out on the key technologies of bridge design,and the main conclusions are as follows:The whole unit adopts the supporting system of tower pier consolidation and tower-beam separation,and each pier is provided with seismic mitigation and isolation bearing;shaped-steel reinforced concrete bridge tower is adopted to bring into full play the tensile performance of steel and the compressive performance of concrete,and avoid the construction challenges of setting up multi-layer and multi-stirrup reinforcement while improving the bearing capacity of section;a new type of double-side and bi-directional anti-skid anchorage device is adopted for the cable saddle of wire divider pipe in order to withstand the unbalanced cable force,and verify the reliability of the anti-skid anchorage device by solid model test;and large-segment cantilever pouring design is adopted for the main girder with a maximum segment length of 8 m to effectively shorten the construction period of the bridge.展开更多
文摘The high-speed EMUs for Jakarta-Bandung high-speed railway(HSR)represent an important image and symbol of the Jakarta-Bandung HSR Project.By relying on the technical platform of the model CR400 EMU,the EMU is upgraded for the customized design in terms of adaptability to geographical environment and track conditions,integration of Indonesian cultural characteristics,etc.In the course of development,in order to accurately grasp the boundary conditions and solve matching adaptation problems,studies are conducted on the exploration of design boundary and the related special technology.With the systematic analysis and design experience summary of the high-speed EMUs for Jakarta-Bandung HSR,the paper aims to provide reference for the O&M of high-speed EMUs for Jakarta-Bandung HSR and the other similar overseas HSR projects.
文摘On September 7,the Jakarta-Bandung High-Speed Railway(Jakarta-Bandung HSR),jointly built by China and Indonesia,opened,cutting the travel time between the two Indonesian cities from 3.5 hours to 40 minutes.Commercial operation will start at the beginning of October.
基金supported by the National Natural Science Foundation of China (Grant No.U61273205).
文摘Purpose-This study aims to ensure the operation safety of high speed trains,it is necessary to carry out nondestructive monitoring of the tensile damage of the gearbox housing material in rail time,yet the traditional tests of mechanical property can hardly meet this requirement.Design/methodology/approach-In this study the acoustic emission(AE)technology is applied in the tensile tests of the gearbox housing material of an high-speed rail(HSR)train,during which the acoustic signatures are acquired for parameter analysis.Afterward,the support vector machine(SVM)classifier is introduced to identify and classify the characteristic parameters extracted,on which basis the SVM is improved and the weighted support vector machine(WSVM)method is applied to effectively reduce the misidentification of the SVM classifier.Through the study of the law of relations between the characteristic values and the tensile life,a degradation model of the gearbox housing material amid tensile is built.Findings-The results show that the growth rate of the logarithmic hit count of AE signals and that of logarithmic amplitude can well characterize the stage of the material tensile process,and the WSVM method can improve the classification accuracy of the imbalanced data to above 94%.The degradation model built can identify the damage occurred to the HSR gearbox housing material amid the tensile process and predict the service life remains.Originality/value-The results of this study provide new concepts for the life prediction of tensile samples,and more further tests should be conducted to verify the conclusion of this research.
文摘Up till now,no systematic studies on railway route selection in urban areas,HSR route selection in particular,have been taken in China.Based on the Shenzhen Railway Terminal Project and the Shenzhen-Shanwei Railway Project,research on HSR route selection in complicated urban areas has been conducted.An optimal route selection plan is determined after studying the local geological and environmental conditions and the complexity of tunnel construction.The research concludes that there are four major concerns in HSR route selection:the match between the new route and the urban planning,the potential economic return for the massive investment,the likely impacts of land expropriation on social stability,and the best synthesis of multiple controlling factors to meet the HSR standard.Moreover,six principles should be followed in railway route selection in complicated urban areas:the new route should be in alignment with the railway deployment;the route should align with the existing passage as much as possible;extensive analysis and in-depth demonstrations should be done to find the most appropriate combination of open and hidden excavation in tunnel construction;geological conditions and tunnel construction complexities are among the priorities;environmental sensitive sites and environmental vibration noise should be avoided as much as possible;special attention should be paid to the relocation of the power supply,television and communication facilities and the rearrangement of tubes and wires.
文摘Changqing Yellow River Super-long Bridge of Zhengzhou-Ji'nan HSR is a partial cable-stayed bridge with concrete main girder and a unit length of 1,080 m.Studies are carried out on the key technologies of bridge design,and the main conclusions are as follows:The whole unit adopts the supporting system of tower pier consolidation and tower-beam separation,and each pier is provided with seismic mitigation and isolation bearing;shaped-steel reinforced concrete bridge tower is adopted to bring into full play the tensile performance of steel and the compressive performance of concrete,and avoid the construction challenges of setting up multi-layer and multi-stirrup reinforcement while improving the bearing capacity of section;a new type of double-side and bi-directional anti-skid anchorage device is adopted for the cable saddle of wire divider pipe in order to withstand the unbalanced cable force,and verify the reliability of the anti-skid anchorage device by solid model test;and large-segment cantilever pouring design is adopted for the main girder with a maximum segment length of 8 m to effectively shorten the construction period of the bridge.