The single machine parallel-batch scheduling with deteriorating jobs and rejection is considered in this paper.A job is either rejected,in which a rejection penalty should be paid,or accepted and processed on the mach...The single machine parallel-batch scheduling with deteriorating jobs and rejection is considered in this paper.A job is either rejected,in which a rejection penalty should be paid,or accepted and processed on the machine.Each job’s processing time is an increasing linear function of its starting time.The machine can process any number of jobs simultaneously as a batch.The processing time of a batch is equal to the largest processing time of the jobs in the batch.The objectives are to minimize the makespan and the total weighted completion time,respectively,under the condition that the total rejection penalty cannot exceed a given upper bound Q.We show that both problems are NP-complete and present dynamic programming algorithms and fully polynomial time approximation schemes(FPTASs)for the considered problems.展开更多
We sttidy the problem of scheduling n jobs on m parallel bounded batch machines to minimize the sum of squared machine loads. Each batch contains at most B jobs, and the processing time of a batch is equal to the long...We sttidy the problem of scheduling n jobs on m parallel bounded batch machines to minimize the sum of squared machine loads. Each batch contains at most B jobs, and the processing time of a batch is equal to the longest processing time of the jobs in this batch. We prove this problem to be NP-hard. Furthermore, we present a polynomial time approximation scheme (PTAS) and a fully polynomial time approximation scheme (FPTAS) for this problem.展开更多
基金Supported by the National Natural Science Foundation of China(11871213,71431004).
文摘The single machine parallel-batch scheduling with deteriorating jobs and rejection is considered in this paper.A job is either rejected,in which a rejection penalty should be paid,or accepted and processed on the machine.Each job’s processing time is an increasing linear function of its starting time.The machine can process any number of jobs simultaneously as a batch.The processing time of a batch is equal to the largest processing time of the jobs in the batch.The objectives are to minimize the makespan and the total weighted completion time,respectively,under the condition that the total rejection penalty cannot exceed a given upper bound Q.We show that both problems are NP-complete and present dynamic programming algorithms and fully polynomial time approximation schemes(FPTASs)for the considered problems.
文摘We sttidy the problem of scheduling n jobs on m parallel bounded batch machines to minimize the sum of squared machine loads. Each batch contains at most B jobs, and the processing time of a batch is equal to the longest processing time of the jobs in this batch. We prove this problem to be NP-hard. Furthermore, we present a polynomial time approximation scheme (PTAS) and a fully polynomial time approximation scheme (FPTAS) for this problem.