Taking vertical shaft construction of cutter transformation of the Beijing underground diameter shield for example,the design and construction of cutter structure transformation under complex boundary conditions for l...Taking vertical shaft construction of cutter transformation of the Beijing underground diameter shield for example,the design and construction of cutter structure transformation under complex boundary conditions for large diameter shield were discussed.Practice about how to ensure the structure safety of the shaft as well as well-coordinated shield construction was explored,and reliable solutions were provided successfully,which can provide reference for similar projects.展开更多
The methodology of predicting pile shaft skin ultimate friction has been studied in a systematic way. In the light of that, the analysis of the pile shaft resistance for bored and cast in situ piles in cohesive soil...The methodology of predicting pile shaft skin ultimate friction has been studied in a systematic way. In the light of that, the analysis of the pile shaft resistance for bored and cast in situ piles in cohesive soils was carried out thoroughly in the basis of field performance data of 10 fully instrumented large diameter bored piles (LDBPs) used as the bridge foundation. The undrained strength index μ in term of cohesive soils was brought forward in allusion to the cohesive soils in the consistence plastic state, and can effectively combine the friction angle and the cohesion of cohesive soils in undrained condition. And that the classical ' α method' was modified much in effect to predict the pile shaft skin friction of LDBPs in cohesive soils. Furthermore, the approach of standard penetration test (SPT) N value used to estimate the pile shaft skin ultimate friction was analyzed, and the calculating formulae were established for LDBPs in clay and silt clay respectively.展开更多
文摘Taking vertical shaft construction of cutter transformation of the Beijing underground diameter shield for example,the design and construction of cutter structure transformation under complex boundary conditions for large diameter shield were discussed.Practice about how to ensure the structure safety of the shaft as well as well-coordinated shield construction was explored,and reliable solutions were provided successfully,which can provide reference for similar projects.
文摘The methodology of predicting pile shaft skin ultimate friction has been studied in a systematic way. In the light of that, the analysis of the pile shaft resistance for bored and cast in situ piles in cohesive soils was carried out thoroughly in the basis of field performance data of 10 fully instrumented large diameter bored piles (LDBPs) used as the bridge foundation. The undrained strength index μ in term of cohesive soils was brought forward in allusion to the cohesive soils in the consistence plastic state, and can effectively combine the friction angle and the cohesion of cohesive soils in undrained condition. And that the classical ' α method' was modified much in effect to predict the pile shaft skin friction of LDBPs in cohesive soils. Furthermore, the approach of standard penetration test (SPT) N value used to estimate the pile shaft skin ultimate friction was analyzed, and the calculating formulae were established for LDBPs in clay and silt clay respectively.